I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
9
I.1 BAHAN - BAHAN BANGUNAN 1.
1.07
0.31
0.36
0.56
0.58
M³ M³ M³ M³ M³ M³ M³ M³ M³ M³
428,900.00 466,500.00 428,900.00 482,500.00 504,000.00 482,500.00 386,000.00 428,900.00 418,200.00 268,100.00
553,000.00 601,500.00 553,000.00 622,100.00 649,800.00 622,100.00 497,700.00 553,000.00 539,200.00 345,700.00
572,200.00 622,400.00 572,200.00 643,700.00 672,400.00 643,700.00 515,000.00 572,200.00 557,900.00 357,700.00
651,400.00 708,500.00 651,400.00 732,800.00 765,500.00 732,800.00 586,300.00 651,400.00 635,200.00 407,200.00
661,200.00 698,800.00 661,200.00 743,900.00 777,000.00 743,900.00 595,100.00 661,200.00 644,700.00 500,400.00
M³ M³
772,100.00 160,800.00
995,500.00 207,300.00
1,030,100.00 214,500.00
1,172,600.00 244,200.00
1,190,300.00 247,900.00
M³ M³ M³ M³ M³ M³ M³
107,200.00 536,200.00 107,200.00 134,000.00 509,300.00 80,400.00 53,600.00
138,200.00 691,400.00 138,200.00 172,800.00 656,700.00 103,700.00 69,100.00
143,000.00 715,400.00 143,000.00 178,800.00 679,500.00 107,300.00 71,500.00
162,800.00 814,400.00 162,800.00 203,500.00 773,500.00 122,100.00 81,400.00
165,300.00 826,600.00 165,300.00 206,600.00 785,200.00 124,000.00 82,600.00
Bh Bh Bh Bh Bh
1,970.20 17,200.00 17,200.00 4,800.00 4,800.00
1,886.94 22,200.00 22,200.00 6,200.00 6,200.00
1,900.80 22,900.00 22,900.00 6,400.00 6,400.00
2,172.00 26,100.00 26,100.00 7,300.00 7,300.00
2,289.21 26,500.00 26,500.00 7,400.00 7,400.00
Bh Bh Bh
5,400.00 6,400.00 7,500.00
7,000.00 8,300.00 9,700.00
7,200.00 8,500.00 10,000.00
8,200.00 9,700.00 11,400.00
8,300.00 9,900.00 11,600.00
Bahan Dinding Dan Pondasi 1 Batu - Batu Pecah 14-15 cm - Batu Pecah 5-7 cm - Batu Pecah 3-5 cm - Batu Pecah 2-3 cm - Batu Pecah 1-2 cm - Batu Pecah 0,5 -1 cm - Batu Gunung - Batu Padas - Batu Pasang (Bulat) - Batu Kali 2 Koral - Batu Koral (Palu) 3 Timbunan (Lokal) Pilihan 4 Pasir - Pasir Pasangan (Lokal) - Pasir Beton (Palu) - Pasir Urug (Lokal) 5 Sirtu (Pasir Batu) 6 Kapur Padam 7 Tanah Urug / Timbunan Biasa 8 Tanah Liat 9 Batu Bata - Bata Merah - Bata Ringan 60 x 20 x 7,5 cm (Hebel) - Bata Ringan 60 x 19 x 7,5 cm (Acon) - Bata Beton 30 x 15 x 8 cm K 175 = 22 m2 - Bata Beton 30 x 15 x 7 cm K 175 = 22 m2 10 Batako - Batako Lokal (Berau) 7,5 x 19 x 13,5 - Batako Lubang 3 - 40 x 20 x 10 cm - Batako Lubang 2 - 39 x 19 x 9 cm K 225 11 Beton Cetak (Paving Stone)
Halaman 1
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 -
Segi Empat 30 x 30 x 8 cm (natural) Segi Empat 30 x 30 x 8 cm (full warna) Segi Empat 30 x 30 x 8 cm K 400 = 11/m2 (natural) Segi Empat 30 x 30 x 8 cm K 400 = 11/m2 (full warna) Segi Empat 21 x 10.5 x 10 cm K 225 = 44/m2 (natural) Segi Empat 21 x 10.5 x 10 cm K 225 = 44/m2 (full warna) Segi Empat 21 x 10.5 x 10 cm K 400 = 44/m2 (natural) Segi Empat 21 x 10.5 x 10 cm K 400 = 44/m2 (full warna) Segi Empat 21 x 10.5 x 8 cm K 225 = 44/m2 (natural) Segi Empat 21 x 10.5 x 8 cm K 225 = 44/m2 (full warna) Segi Empat 21 x 10.5 x 8 cm K 400 = 44/m2 (natural) Segi Empat 21 x 10.5 x 8 cm K 400 = 44/m2 (full warna) Segi Empat 21 x 10.5 x 6 cm K 225 = 44/m2 (natural) Segi Empat 21 x 10.5 x 6 cm K 225 = 44/m2 (full warna) Segi Empat 21 x 10.5 x 6 cm K 400 = 44/m2 (natural) Segi Empat 21 x 10.5 x 6 cm K 400 = 44/m2 (full warna) Segi Enam 24 x 8 cm (natural) Segi Enam 24 x 8 cm (full warna) Segi Enam 24 x 8 cm K 400 = 27/m2 (natural) Segi Enam 24 x 8 cm K 400 = 27/m2 (full warna) Segi Enam 24 x 6 cm K 225 = 27/m2 (natural) Segi Enam 24 x 6 cm K 225 = 27/m2 (full warna) Segi Enam 24 x 6 cm K 400 = 27/m2 (natural) Segi Enam 24 x 6 cm K 400 = 27/m2 (full warna) Serasi 22 x 11 x 8 cm K 225 = 40/m2 (natural) Serasi 22 x 11 x 8 cm K 225 = 40/m2 (full warna) Serasi 22 x 11 x 8 cm K 400 = 40/m2 (natural) Serasi 22 x 11 x 8 cm K 400 = 40/m2 (full warna) Serasi 22 x 11 x 6 cm K 225 = 45/m2 (natural) Serasi 22 x 11 x 6 cm K 225 = 45/m2 (full warna) Serasi 22 x 11 x 6 cm K 400 = 45/m2 (natural) Serasi 22 x 11 x 6 cm K 400 = 45/m2 (full natural) Tiga Berlian 8 cm K 225 = 34/m2 (natural) Tiga Berlian 8 cm K 225 = 34/m2 (full warna) Tiga Berlian 8 cm K 400 = 34/m2 (natural) Tiga Berlian 8 cm K 400 = 34/m2 (full warna) Tiga Berlian 6 cm K 225 = 34/m2 (natural) Tiga Berlian 6 cm K 225 = 34/m2 (full warna) Tiga Berlian 6 cm K 400 = 34/m2 (natural)
3 Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4 18,200.00 21,400.00 22,500.00 26,800.00 6,400.00 8,600.00 9,700.00 10,700.00 7,500.00 7,000.00 8,600.00 9,100.00 6,400.00 7,500.00 8,000.00 5,700.00 9,900.00 11,000.00 11,800.00 13,100.00 9,100.00 9,700.00 9,100.00 10,200.00 6,400.00 8,800.00 8,000.00 9,100.00 5,400.00 7,000.00 5,900.00 8,000.00 6,400.00 7,800.00 8,600.00 9,700.00 7,000.00 7,500.00 8,000.00
5 23,500.00 27,600.00 29,000.00 34,600.00 8,300.00 11,100.00 12,500.00 13,800.00 9,700.00 9,000.00 11,100.00 11,700.00 8,300.00 9,700.00 10,300.00 7,300.00 12,800.00 14,200.00 15,200.00 16,900.00 11,700.00 12,500.00 11,700.00 13,100.00 8,300.00 11,400.00 10,300.00 11,700.00 7,000.00 9,000.00 7,600.00 10,300.00 8,300.00 10,000.00 11,100.00 12,500.00 9,000.00 9,700.00 10,300.00
6 24,300.00 28,600.00 30,000.00 35,800.00 8,500.00 11,500.00 12,900.00 14,300.00 10,000.00 9,300.00 11,500.00 12,100.00 8,500.00 10,000.00 10,700.00 7,600.00 13,200.00 14,700.00 15,700.00 17,500.00 12,100.00 12,900.00 12,100.00 13,600.00 8,500.00 11,800.00 10,700.00 12,100.00 7,200.00 9,300.00 7,900.00 10,700.00 8,500.00 10,400.00 11,500.00 12,900.00 9,300.00 10,000.00 10,700.00
7 27,700.00 32,500.00 34,200.00 40,700.00 9,700.00 13,100.00 14,700.00 16,300.00 11,400.00 10,600.00 13,100.00 13,800.00 9,700.00 11,400.00 12,200.00 8,600.00 15,000.00 16,700.00 17,900.00 19,900.00 13,800.00 14,700.00 13,800.00 15,500.00 9,700.00 13,400.00 12,200.00 13,800.00 8,200.00 10,600.00 9,000.00 12,200.00 9,700.00 11,800.00 13,100.00 14,700.00 10,600.00 11,400.00 12,200.00
Keterangan Zona V 8
9
28,100.00 33,000.00 34,700.00 41,300.00 9,900.00 13,200.00 14,900.00 16,500.00 11,600.00 10,800.00 13,200.00 14,000.00 9,900.00 11,600.00 12,400.00 8,800.00 15,300.00 17,000.00 18,200.00 20,200.00 14,000.00 14,900.00 14,000.00 15,700.00 9,900.00 13,600.00 12,400.00 14,000.00 8,300.00 10,800.00 9,100.00 12,400.00 9,900.00 12,000.00 13,200.00 14,900.00 10,800.00 11,600.00 12,400.00
Halaman 2
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 12
11
12
13
14
15
- Tiga Berlian 6 cm K 400 = 34/m2 (full warna) Curbin - Curbin PU 50 x 30 x 13 x 20 cm K 225 = 2/m2 - Curbin PU 50 x 30 x 13 x 20 cm K 400 = 2/m2 - Curbin PU 50 x 30 x 11 x 18 cm K 225 = 2/m2 - Curbin PU 50 x 30 x 11 x 18 cm K 400 = 2/m2 - Curbin Tipis 50 x 30 x 7 x 14 cm K 225 = 2/m2 - Curbin Tipis 50 x 30 x 7 x 14 cm K 400 = 2/m2 - Curbin Tanam 50 x 20 x 10 x 14 cm K 225 = 2/m2 - Curbin Tanam 50 x 20 x 10 x 14 cm K 400 = 2/m2 - Curbin Castin (CT) 20 x 20 x 10 x 14 cm K 225 = 4.5/m2 - Curbin Castin (CT) 20 x 20 x 10 x 14 cm K 400 = 4.5/m2 Grass Block - Grass Block 14 x 27.5 x 8 cm K 225 = 9/m2 - Grass Block 14 x 27.5 x 8 cm K 400 = 9/m2 Batu Tempel - Batu Tempel Palimanan 15 x 30 - Batu Tempel Paras 15 x 30 - Batu Tempel Hitam (candi) - Batu Tempel Alur Andersit - Batu Tempel Acak/Lempeng Semen - Semen PC 40 kg - Semen PC 50 kg - Semen Putih 40 kg - Semen Warna Beton Ready Mix - Beton f'c 19,3 Mpa setara K -175 - Beton f'c 14,5 Mpa setara K - 225 - Beton f'c 21,7 Mpa setara K - 250 - Beton f'c 24 Mpa setara K - 275 - Beton f'c 26,4 Mpa setara K - 300 - Beton f'c 31,2 Mpa setara K - 350 - Beton f'c 35,7 Mpa setara K - 400 - Beton f'c 44,6 Mpa setara K - 500 Cemical Building - Sika C (Natural)
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
Bh
8,600.00
11,100.00
11,500.00
13,100.00
13,200.00
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
69,700.00 89,000.00 65,400.00 75,100.00 57,900.00 64,300.00 59,000.00 68,600.00 21,400.00 24,700.00
89,900.00 114,800.00 84,300.00 96,800.00 74,700.00 82,900.00 76,100.00 88,500.00 27,600.00 31,800.00
93,000.00 118,700.00 87,300.00 100,200.00 77,200.00 85,800.00 78,700.00 91,500.00 28,600.00 32,900.00
105,900.00 135,200.00 99,300.00 114,000.00 87,900.00 97,700.00 89,600.00 104,200.00 32,500.00 37,500.00
107,500.00 137,200.00 100,800.00 115,800.00 89,300.00 99,100.00 90,900.00 105,800.00 33,000.00 38,100.00
Bh Bh
22,500.00 32,200.00
29,000.00 41,500.00
30,000.00 42,900.00
34,200.00 48,900.00
34,700.00 49,600.00
Bh Bh Bh Bh Bh
155,500.00 171,600.00 118,000.00 193,000.00 171,600.00
200,500.00 221,200.00 152,100.00 248,900.00 221,200.00
207,500.00 228,900.00 157,400.00 257,500.00 228,900.00
236,200.00 260,600.00 179,200.00 293,100.00 260,600.00
239,700.00 264,500.00 181,900.00 297,500.00 264,500.00
kg kg kg kg
1,900.00 2,000.00 5,500.00 16,100.00
2,000.00 2,000.00 7,100.00 20,800.00
2,000.00 2,000.00 7,300.00 21,500.00
2,300.00 2,300.00 8,400.00 24,400.00
2,500.00 2,500.00 8,500.00 24,800.00
M³ M³ M³ M³ M³ M³ M³ M³
1,474,400.00 1,576,300.00 1,624,500.00 1,699,600.00 1,758,600.00 1,876,500.00 2,042,700.00 2,294,700.00
1,901,100.00 2,032,400.00 2,094,600.00 2,191,400.00 2,267,500.00 2,419,500.00 2,633,800.00 2,958,700.00
1,967,100.00 2,103,000.00 2,167,300.00 2,267,500.00 2,346,200.00 2,503,500.00 2,725,300.00 3,061,500.00
2,239,300.00 2,394,100.00 2,467,300.00 2,581,300.00 2,670,900.00 2,850,000.00 3,102,500.00 3,485,200.00
2,273,000.00 2,430,100.00 2,504,400.00 2,620,200.00 2,711,100.00 2,892,900.00 3,149,100.00 3,537,600.00
Kg
31,500.00
40,600.00
42,000.00
47,900.00
48,600.00
9
Halaman 3
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1
2.
- Puzzdith - 100 XR - Storox - 100 - Fosroc PPF M06 0.9 Kg Bahan Atap 1 Sirap kayu ulin 2 Genteng Metal - Multi Roof Polos - Surya Roof Type Stone - Sakura Roof Type Elang - Multi Stone (2 Gelombang) 3 Nok Genteng Metal - Nok Multi Roof Stone - Nok Ratu - Nok Putri 4 Genteng Beton - Genteng Beton - Nok Genteng Beton 5 Genteng Keramik - Genteng Keramik - Nok Genteng Keramik - Karpus Genteng keramik 6 Asbes - Gelombang uk. 2.5 x 92 cm - Gelombang uk. 2.25 x 92 cm - Gelombang uk. 1.0 x 92 cm - Gelombang uk. 85 x 115 cm - Gelombang uk. 2.00 x 92 cm x 5 mm - Gelombang uk. 1.80 x 92 cm x 5 mm - Gelombang uk. 3.00 x 1.05 cm x 4 mm - Gelombang uk. 2.70 x 1.05 cm x 4 mm - Gelombang uk. 2.40 x 1.05 cm x 4 mm - Gelombang uk. 2.10 x 1.05 cm x 4 mm - Gelombang uk. 1.50 x 1.05 cm x 4 mm - Gelombang uk. 2.70 x 1.08 cm x 6 mm - Gelombang uk. 1.80 x 0.8 cm - Bubungan Asbes
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
Ltr Kg Kg
225,200.00 148,000.00 244,500.00
290,400.00 190,800.00 315,200.00
300,400.00 197,400.00 326,200.00
342,000.00 224,800.00 371,300.00
347,200.00 228,200.00 376,900.00
Lbr
1,400.00
1,800.00
1,900.00
2,100.00
2,200.00
Lbr Lbr Lbr Lbr
118,000.00 91,100.00 52,500.00 154,400.00
152,100.00 117,500.00 67,700.00 199,100.00
157,400.00 121,600.00 70,100.00 206,000.00
179,200.00 138,400.00 79,800.00 234,500.00
181,900.00 140,500.00 81,000.00 238,000.00
Lbr Lbr Lbr
59,000.00 26,800.00 21,400.00
76,100.00 34,600.00 27,600.00
78,700.00 35,800.00 28,600.00
89,600.00 40,700.00 32,500.00
90,900.00 41,300.00 33,000.00
Bh Bh
19,300.00 24,700.00
24,900.00 31,800.00
25,700.00 32,900.00
29,300.00 37,500.00
29,800.00 38,100.00
Bh Bh Bh
24,700.00 32,200.00 39,700.00
31,800.00 41,500.00 51,200.00
32,900.00 42,900.00 53,000.00
37,500.00 48,900.00 60,300.00
38,100.00 49,600.00 61,200.00
Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr
64,300.00 64,900.00 75,100.00 67,600.00 56,800.00 41,300.00 139,400.00 123,700.00 107,200.00 98,700.00 80,400.00 48,300.00 53,600.00 59,000.00
82,900.00 83,700.00 96,800.00 87,100.00 73,200.00 53,200.00 179,700.00 159,500.00 138,200.00 127,200.00 103,700.00 62,300.00 69,100.00 76,100.00
85,800.00 86,600.00 100,200.00 90,200.00 75,800.00 55,100.00 186,000.00 165,000.00 143,000.00 131,700.00 107,300.00 64,400.00 71,500.00 78,700.00
97,700.00 98,600.00 114,000.00 102,600.00 86,300.00 62,700.00 211,700.00 187,900.00 162,800.00 149,900.00 122,100.00 73,300.00 81,400.00 89,600.00
99,100.00 100,000.00 115,800.00 104,200.00 87,600.00 63,700.00 214,900.00 190,700.00 165,300.00 152,100.00 124,000.00 74,400.00 82,600.00 90,900.00
9
Halaman 4
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1
6
8
9 10
11 12 13 14 15 16 17
18 19
- Karpus asbes gelombang besar - Karpus asbes gelombang kecil Atap Bitumen - Tipe Onduline (95 cm x 200 cm x 0,3 cm x 3,8 cm) - Tipe Onduvilla (40 cm x 106 cm x 0,3 cm x 4 cm) - Tipe Bitumen CT - Tipe Guttrapal Atap Seng Gelombang - BJLS 40 KI - BJLS 30 KI - BJLS 27 KI - BJLS 20 KI - BJLS 18 KI Bubungan Seng Gelombang BJLS 30 Nok - Nok stel gelombang 1.05 - Nok stel gelombang 1.08 - Nok paten 0.92 - Nok paten 1.05 - Nok paten 1.08 - Nok stel rata 0.92 - Nok stel rata 1.05 - Nok standar 40 cm, swg 22 Genteng Kaca Roof Light Fiber Glass 180 x 90 m Seng Plastik Atap Nipah Atap Alluminium Gelombang Ijuk Aluminium Foil - Aluminium foil 70 m' dobel sheet - Aluminium foil 70 m' single sheet - Aluminium foil 70 m' single sheet - Aluminium 0.55 mm Nok Bitumen (100 cm x 50 cm x 0,3 cm) Nok dan Talang Bitumen
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
Lbr Lbr
54,700.00 66,500.00
70,500.00 85,700.00
73,000.00 88,700.00
83,100.00 101,000.00
84,300.00 102,500.00
Lbr Lbr Lbr Lbr
190,400.00 83,600.00 180,100.00 203,300.00
245,500.00 107,800.00 232,200.00 262,100.00
254,000.00 111,500.00 240,300.00 271,200.00
289,200.00 127,000.00 273,600.00 308,800.00
293,600.00 128,900.00 277,700.00 313,400.00
Lbr Lbr Lbr Lbr Lbr Lbr
150,100.00 128,700.00 116,300.00 81,500.00 69,700.00 67,600.00
193,500.00 165,900.00 150,000.00 105,100.00 89,900.00 87,100.00
200,300.00 171,700.00 155,200.00 108,700.00 93,000.00 90,200.00
228,000.00 195,500.00 176,700.00 123,800.00 105,900.00 102,600.00
231,400.00 198,400.00 179,300.00 125,600.00 107,500.00 104,200.00
Bh Bh Bh Bh Bh Bh Bh Bh Bh Lbr Lbr Lbr Lbr Kg
37,500.00 42,900.00 41,800.00 53,600.00 36,500.00 39,700.00 39,700.00 39,700.00 21,400.00 96,500.00 32,200.00 7,500.00 69,700.00 75,100.00
48,400.00 55,300.00 53,900.00 69,100.00 47,100.00 51,200.00 51,200.00 51,200.00 27,600.00 124,400.00 41,500.00 9,700.00 89,900.00 96,800.00
50,000.00 57,200.00 55,800.00 71,500.00 48,700.00 53,000.00 53,000.00 53,000.00 28,600.00 128,700.00 42,900.00 10,000.00 93,000.00 100,200.00
57,000.00 65,200.00 63,500.00 81,400.00 55,400.00 60,300.00 60,300.00 60,300.00 32,500.00 146,600.00 48,900.00 11,400.00 105,900.00 114,000.00
57,800.00 66,100.00 64,500.00 82,600.00 56,200.00 61,200.00 61,200.00 61,200.00 33,000.00 148,800.00 49,600.00 11,600.00 107,500.00 115,800.00
Glng Glng
579,000.00 407,500.00 42,900.00 482,500.00 122,200.00 48,300.00
746,600.00 525,400.00 55,300.00 622,100.00 157,600.00 62,300.00
772,500.00 543,700.00 57,200.00 643,700.00 163,000.00 64,400.00
879,400.00 618,900.00 65,200.00 732,800.00 185,600.00 73,300.00
892,600.00 628,200.00 66,100.00 743,900.00 188,400.00 74,400.00
M2 Lbr Lbr Lbr
9
Halaman 5
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 20 21 22 23 24 25 25 25 26 3.
4
5
6
7
Keterangan Zona V 8
9
Pekerjaan kuda-kuda baja ringan, spesifikasi bahan Hi-Ten G550 Kuda - Kuda Bentang s/d 9 m Kuda- Kuda Non Standar Baja ringan C 100 - 100 Baja ringan C 75 - 100 Baja ringan Reng Rangka atap Baja Ringan Rangka plafond Metal furing Dynabolt
M2 M2 M' M' M' M2 M2 Bh
375,300.00 428,900.00 145,900.00 86,900.00 30,600.00 128,700.00 53,600.00 8,600.00
483,900.00 553,000.00 188,100.00 112,000.00 39,400.00 165,900.00 69,100.00 11,100.00
500,700.00 572,200.00 194,700.00 115,900.00 40,800.00 171,700.00 71,500.00 11,500.00
570,000.00 651,400.00 221,600.00 132,000.00 46,500.00 195,500.00 81,400.00 13,100.00
578,600.00 661,200.00 224,900.00 133,900.00 47,200.00 198,400.00 82,600.00 13,200.00
M2 M2
193,000.00 230,500.00 630,500.00 1,018,700.00 235,900.00 214,500.00 289,500.00 321,700.00 300,200.00 353,900.00 482,500.00 537,200.00 670,200.00 386,000.00 1,769,300.00 3,431,400.00 53,600.00 841,800.00 122,200.00
248,900.00 297,200.00 813,000.00 1,313,500.00 304,200.00 276,600.00 373,300.00 414,800.00 387,100.00 456,300.00 622,100.00 692,700.00 864,100.00 497,700.00 2,281,300.00 4,424,400.00 69,100.00 1,085,400.00 157,600.00
257,500.00 307,500.00 841,200.00 1,359,100.00 314,700.00 286,200.00 386,200.00 429,200.00 400,500.00 472,100.00 643,700.00 716,700.00 894,100.00 515,000.00 2,360,500.00 4,578,000.00 71,500.00 1,123,100.00 163,000.00
293,100.00 350,100.00 957,600.00 1,547,200.00 358,300.00 325,800.00 439,700.00 488,600.00 456,000.00 537,500.00 732,800.00 815,900.00 1,017,900.00 586,300.00 2,687,200.00 5,211,600.00 81,400.00 1,278,500.00 185,600.00
297,500.00 355,400.00 972,000.00 1,570,500.00 363,700.00 330,700.00 446,300.00 495,900.00 462,800.00 545,600.00 743,900.00 828,200.00 1,033,200.00 595,100.00 2,727,600.00 5,290,000.00 82,600.00 1,297,700.00 188,400.00
Bh Bh Bh
193,000.00 193,000.00 29,000.00
248,900.00 248,900.00 37,400.00
257,500.00 257,500.00 38,700.00
293,100.00 293,100.00 44,000.00
297,500.00 297,500.00 44,700.00
Bahan Kaca 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
4.
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
Kaca Bening 3 mm Kaca Bening 5 mm Kaca Bening 8 mm Kaca Bening 12 mm Kaca Ryben 3 mm Kaca Ryben 5 mm Kaca Ryben 8 mm Kaca Ryben 12 mm Kaca Nako 5 mm Kaca Cermin 5 mm Kaca Cermin 6 mm Kaca Cermin 8 mm Kaca Stopsol Kaca Nako Antik Kaca Wireglass 5 mm Kaca Patri ukir warna 5 mm Profil Kaca Kaca Tempered 6 mm Kaca S
M2 M2 M2 M2 M2 M2 M2 M2 Buah M2 M2 M2 M2 M2 M2 M2 Bh
Bahan Listrik 1 Titik Lampu + Instalasi 2 Stop Kontak + Instalasi 3 Stop Kontak Tunggal
Halaman 6
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
Stop Kontak Double Stop Kontak Tripel Sakelar Engkel Sakelar Double Kabel Listrik NYA 1,5 mm Kabel Listrik NYA 2,5 mm Kabel Listrik NYA 4 mm Kabel Listrik NYMHY 3 x 2,5 mm Kabel TM Kabel Travo Kabel Grounding BC 1 x 70 mm Kabel Grounding BC 25 mm Kabel Grounding NYA 1 x 16 mm Kabel Grounding NYA 1 x 25 mm Kabel NYFGBY 4 x 16 mm Kabel NYFGBY 4 x 2,5 mm Kabel NYFGBY 4 x 25 mm Kabel NYFGBY 4 x 4 mm Kabel NYFGBY 4 x 50 mm Kabel NYFGBY 4 x 70 mm Kabel NYM 3 x 2.5 mm Kabel NYM 2 x 2.5 mm Kabel NYY 1 x 70 mm Kabel NYY 4 x 16 mm Kabel NYY 4 x 185 mm Kabel NYY 4 x 35 mm Kabel NYY 4 x 50 mm Kabel NYY 4 x 6 mm Kabel NYY 4 x 70 mm Kabel NYA 1 x 4 mm Kabel NYA 1 x 6 mm Kabel NYY 4 x 4 mm Kabel NYY 1 x 240 mm Kabel NYY 1 x 185 mm Kabel NYY 1 x 120 mm Kabel NYY 1 x 70 mm Kabel NYY 4 x 10 mm Kabel NYY 4 x 120 mm Kabel NYY 4 x 150 mm
3 Bh Bh Bh Bh Roll Roll Roll Roll Roll Roll M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M'
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4 37,500.00 85,800.00 59,000.00 64,300.00 187,700.00 316,300.00 643,400.00 1,769,300.00 1,769,300.00 1,769,300.00 127,600.00 67,100.00 91,600.00 100,700.00 154,500.00 73,800.00 221,800.00 91,300.00 363,000.00 512,000.00 50,200.00 32,200.00 127,600.00 325,900.00 651,000.00 295,700.00 329,300.00 94,000.00 597,300.00 36,800.00 40,200.00 87,300.00 2,847,000.00 1,474,200.00 1,066,700.00 133,000.00 166,600.00 750,300.00 645,700.00
5 48,400.00 110,600.00 76,100.00 82,900.00 242,000.00 407,800.00 829,600.00 2,281,300.00 2,281,300.00 2,281,300.00 164,500.00 86,500.00 118,100.00 129,800.00 199,200.00 95,100.00 286,000.00 117,700.00 468,000.00 660,200.00 64,700.00 41,500.00 164,500.00 420,200.00 839,400.00 381,300.00 424,600.00 121,200.00 770,100.00 47,400.00 51,800.00 112,600.00 3,670,800.00 1,900,800.00 1,375,400.00 171,500.00 214,800.00 967,400.00 832,500.00
6 50,000.00 114,500.00 78,700.00 85,800.00 250,400.00 422,000.00 858,400.00 2,360,500.00 2,360,500.00 2,360,500.00 170,200.00 89,500.00 122,200.00 134,300.00 206,100.00 98,500.00 295,900.00 121,800.00 484,300.00 683,100.00 67,000.00 42,900.00 170,200.00 434,800.00 868,500.00 394,500.00 439,300.00 125,400.00 796,900.00 49,100.00 53,600.00 116,500.00 3,798,300.00 1,966,800.00 1,423,100.00 177,400.00 222,300.00 1,001,000.00 861,400.00
7 57,000.00 130,300.00 89,600.00 97,700.00 285,100.00 480,400.00 977,200.00 2,687,200.00 2,687,200.00 2,687,200.00 193,800.00 101,900.00 139,100.00 152,900.00 234,700.00 112,100.00 336,800.00 138,600.00 551,300.00 777,600.00 76,200.00 48,900.00 193,800.00 495,000.00 988,700.00 449,100.00 500,100.00 142,800.00 907,200.00 55,900.00 61,100.00 132,600.00 4,324,000.00 2,239,000.00 1,620,100.00 202,000.00 253,000.00 1,139,500.00 980,700.00
Keterangan Zona V 8
9
57,800.00 132,300.00 90,900.00 99,100.00 289,300.00 487,600.00 991,900.00 2,727,600.00 2,727,600.00 2,727,600.00 196,700.00 103,500.00 141,200.00 155,200.00 238,200.00 113,800.00 341,900.00 140,700.00 559,600.00 789,300.00 77,400.00 49,600.00 196,700.00 502,400.00 1,003,600.00 455,900.00 507,700.00 144,900.00 920,800.00 56,700.00 62,000.00 134,600.00 4,389,000.00 2,272,700.00 1,644,500.00 205,000.00 256,900.00 1,156,700.00 995,400.00
Halaman 7
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 69 70 71 72 73 74 75
Kabel NYY 4 x 240 mm Kabel NYFGBY 4 x 16 mm Kabel NYFGBY 4 x 10 mm Kabel NYFGBY 4 x 6 mm Kabel NYFGBY 4 x 35 mm Kabel NYFGBY 4 x 240 mm Kabel NYY 2 x ( 3 x 16 mm ) Kabel NYY 4 x 70 mm Kabel NYY 4 x 35 mm Kabel NYY 2 x ( 3 x 35 mm ) Kabel NYY 2 x ( 3 x 25 mm ) Kabel NYY 2 x ( 3 x 16 mm ) Kabel NYY 3 x 2,5 mm Kabel NYY 3 x 35 mm Kabel Twist 4 x 70 mm Kabel Twist 4 x 35 mm Kabel N2XY 3 x ( 1 x 70 mm) Kabel Grounding BC 10 mm Kabel Tray 200 x 100 Kabel Tray 300 x 100 Kabel Grounding BC 10 mm Kabel N2XY 1 x 50 mm Kabel TM NA2SEBy 3 x 120 mm IPA Kabel TM NA2SEBy 3 x 70 mm Intake Kabel TM NA2SXY1 x 120 mm2 Kabel TM NA2SXY 1 x 70 mm2 Kabel NYHY 5 x 0.75 MM2 @ 100 m Kabel telephone 4x0,5 mm Zekering Kas Lokal 1 Group Zekering Kas Lokal 2 Group Zekering Kas Lokal 3 Group Embodus Pipa Conduit Fitting T-Doos / Cabang
3 M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' Bh Bh Bh Bh Btg Bh Bh
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4 603,200.00 149,200.00 149,200.00 115,500.00 256,700.00 1,635,000.00 189,500.00 591,900.00 290,400.00 391,200.00 290,400.00 189,500.00 48,300.00 263,500.00 492,100.00 290,400.00 592,900.00 34,800.00 357,600.00 458,400.00 34,800.00 424,800.00 562,500.00 660,500.00 545,200.00 483,400.00 15,400.00 13,900.00 80,400.00 134,000.00 209,100.00 5,400.00 9,700.00 10,700.00 6,400.00
5 777,800.00 192,400.00 192,400.00 148,900.00 331,000.00 2,108,100.00 244,300.00 763,200.00 374,400.00 504,400.00 374,400.00 244,300.00 62,300.00 339,700.00 634,500.00 374,400.00 764,500.00 44,900.00 461,100.00 591,100.00 44,900.00 547,700.00 725,300.00 851,600.00 703,000.00 623,300.00 19,900.00 17,900.00 103,700.00 172,800.00 269,600.00 7,000.00 12,500.00 13,800.00 8,300.00
6 804,800.00 199,000.00 199,000.00 154,100.00 342,500.00 2,181,300.00 252,800.00 789,700.00 387,400.00 521,900.00 387,400.00 252,800.00 64,400.00 351,500.00 656,500.00 387,400.00 791,000.00 46,400.00 477,100.00 611,600.00 46,400.00 566,800.00 750,500.00 881,200.00 727,400.00 644,900.00 20,600.00 18,600.00 107,300.00 178,800.00 279,000.00 7,200.00 12,900.00 14,300.00 8,500.00
7 916,100.00 226,600.00 226,600.00 175,400.00 389,900.00 2,483,200.00 287,800.00 899,000.00 441,000.00 594,100.00 441,000.00 287,800.00 73,300.00 400,200.00 747,400.00 441,000.00 900,500.00 52,900.00 543,100.00 696,200.00 52,900.00 645,200.00 854,300.00 1,003,100.00 828,000.00 734,200.00 23,400.00 21,100.00 122,100.00 203,500.00 317,600.00 8,200.00 14,700.00 16,300.00 9,700.00
Keterangan Zona V 8
9
929,900.00 230,000.00 230,000.00 178,100.00 395,700.00 2,520,600.00 292,100.00 912,500.00 447,700.00 603,100.00 447,700.00 292,100.00 74,400.00 406,200.00 758,600.00 447,700.00 914,000.00 53,700.00 551,300.00 706,700.00 53,700.00 654,900.00 867,200.00 1,018,200.00 840,500.00 745,200.00 23,800.00 21,500.00 124,000.00 206,600.00 322,400.00 8,300.00 14,900.00 16,500.00 9,900.00
Halaman 8
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 76 77 78 79 80 81 82 77 78 79 80 80 79 80 81 82 83 84 5.
Klemp Outlet TV Outlet Telephone Downlight/PLC 13 w Fitting Plafond+lampu SL Lampu TL2x18 Watt grille Lampu TL2x36 Watt grille Zekering Box 3 Phase Zekering Box 1 Phase Box PVC isi 4 MCB MCB 6 A MCB 4 A Bola Lampu 5 watt Bola Lampu 8 watt Bola Lampu 11 watt Bola Lampu 14 watt Bola Lampu 18 watt Bola Lampu 23 watt
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
4,300.00 89,000.00 89,000.00 235,900.00 118,000.00 407,500.00 516,800.00 75,100.00 48,300.00 160,800.00 85,800.00 85,800.00 30,000.00 34,300.00 38,600.00 40,700.00 42,900.00 50,400.00
5,500.00 114,800.00 114,800.00 304,200.00 152,100.00 525,400.00 666,400.00 96,800.00 62,300.00 207,300.00 110,600.00 110,600.00 38,700.00 44,200.00 49,800.00 52,500.00 55,300.00 65,000.00
5,700.00 118,700.00 118,700.00 314,700.00 157,400.00 543,700.00 689,500.00 100,200.00 64,400.00 214,500.00 114,500.00 114,500.00 40,000.00 45,800.00 51,500.00 54,300.00 57,200.00 67,200.00
6,500.00 135,200.00 135,200.00 358,300.00 179,200.00 618,900.00 784,900.00 114,000.00 73,300.00 244,200.00 130,300.00 130,300.00 45,600.00 52,100.00 58,600.00 61,800.00 65,200.00 76,500.00
6,600.00 137,200.00 137,200.00 363,700.00 181,900.00 628,200.00 796,700.00 115,800.00 74,400.00 247,900.00 132,300.00 132,300.00 46,300.00 52,900.00 59,500.00 62,800.00 66,100.00 77,700.00
Psg Psg Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
147,400.00 231,600.00 16,100.00 32,200.00 10,700.00 26,800.00 16,100.00 53,600.00 26,800.00 160,800.00 268,100.00 118,000.00 134,000.00 439,600.00 91,100.00
190,100.00 298,600.00 20,800.00 41,500.00 13,800.00 34,600.00 20,800.00 69,100.00 34,600.00 207,300.00 345,700.00 152,100.00 172,800.00 566,800.00 117,500.00
196,700.00 309,000.00 21,500.00 42,900.00 14,300.00 35,800.00 21,500.00 71,500.00 35,800.00 214,500.00 357,700.00 157,400.00 178,800.00 586,500.00 121,600.00
223,900.00 351,800.00 24,400.00 48,900.00 16,300.00 40,700.00 24,400.00 81,400.00 40,700.00 244,200.00 407,200.00 179,200.00 203,500.00 667,700.00 138,400.00
227,300.00 357,100.00 24,800.00 49,600.00 16,500.00 41,300.00 24,800.00 82,600.00 41,300.00 247,900.00 413,300.00 181,900.00 206,600.00 677,700.00 140,500.00
9
Bahan Penggantung 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Engsel 3" Setara (SES) Engsel 4"Setara (DEKSON) Engsel Plastik/Nylon Engsel Pintu Kipas Engsel Angin Hak Angin Kait Angin Espagnolet Lengkap Grendel Lokal Kunci Tanam union 1 x Slash Kunci Tanam union 2 x Slash Kunci Tanam Yale 1 x Slash Kunci Tanam Yale 2 x Slash Kunci Tanam Antik Kunci Tanam Pendek
Halaman 9
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 16 17 18 19 20 21 22 23 24 25 26 27 27 28 29 6.
Kunci Tanam Panjang Kunci Tanam Kamar mandi Kunci Silinder Kunci lemari Door Closer Kunci Slot Pegangan pintu ( door holder ) Door Stop Rel Pintu Dorong Roling Door Aluminium Pintu Aluminium Kusen & Pintu PVC toilet Pintu Folding Gate Besi 0.5 mm Vertikals Blinds Spring knip
3 Bh Bh Bh Bh Bh Bh Bh Bh
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
M2 M2 M2 Bh Bh Bh Bh
187,700.00 107,200.00 107,200.00 16,100.00 193,000.00 19,300.00 300,200.00 64,300.00 321,700.00 1,018,700.00 1,608,500.00 1,018,700.00 911,500.00 621,900.00 18,200.00
242,000.00 138,200.00 138,200.00 20,800.00 248,900.00 24,900.00 387,100.00 82,900.00 414,800.00 1,313,500.00 2,074,000.00 1,313,500.00 1,175,300.00 801,900.00 23,500.00
250,400.00 143,000.00 143,000.00 21,500.00 257,500.00 25,700.00 400,500.00 85,800.00 429,200.00 1,359,100.00 2,146,000.00 1,359,100.00 1,216,100.00 829,700.00 24,300.00
285,100.00 162,800.00 162,800.00 24,400.00 293,100.00 29,300.00 456,000.00 97,700.00 488,600.00 1,547,200.00 2,443,000.00 1,547,200.00 1,384,400.00 944,600.00 27,700.00
289,300.00 165,300.00 165,300.00 24,800.00 297,500.00 29,800.00 462,800.00 99,100.00 495,900.00 1,570,500.00 2,479,700.00 1,570,500.00 1,405,200.00 958,800.00 28,100.00
Lbr Lbr Lbr Lbr Lbr Lbr Lbr
69,700.00 85,800.00 91,100.00 134,000.00 187,700.00 241,300.00 332,400.00
89,900.00 110,600.00 117,500.00 172,800.00 242,000.00 311,100.00 428,600.00
93,000.00 114,500.00 121,600.00 178,800.00 250,400.00 321,900.00 443,500.00
105,900.00 130,300.00 138,400.00 203,500.00 285,100.00 366,500.00 504,900.00
107,500.00 132,300.00 140,500.00 206,600.00 289,300.00 372,000.00 512,400.00
Lbr Lbr
225,200.00 209,100.00
290,400.00 269,600.00
300,400.00 279,000.00
342,000.00 317,600.00
347,200.00 322,400.00
Lbr Lbr Lbr Lbr Lbr
150,100.00 171,600.00 222,000.00 371,000.00 316,300.00
193,500.00 221,200.00 286,200.00 478,400.00 407,800.00
200,300.00 228,900.00 296,200.00 495,000.00 422,000.00
228,000.00 260,600.00 337,200.00 563,500.00 480,400.00
208,200.00 264,500.00 342,200.00 572,000.00 487,600.00
9
Bahan Langit - Langit 1 Plywood - Plywood 3 mm - Plywood 4 mm - Plywood 5 mm - Plywood 6 mm - Plywood 9 mm - Plywood 12 mm - Plywood 18 mm 2 Jabarwood - Jabarwood Bergaris - Jabarwood Polos 2 Kalsiboard - Kalsiboard 4 mm - Kalsiboard 6 mm - Kalsiboard 9 mm - Kalsiboard 12 mm - Formika 4' x 3'
Halaman 10
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
1
2 3 Gipsum - Gipsum 9 mm - Gipsum 12 mm - List Gipsum 5 GRC Board - GRC 9 mm - GRC 6 mm 6 Acustik amstrong - Acustik amstrong 30 x 30 cm - Acustik amstrong 30 x 60 cm - Acustik amstrong 60 x 120 cm 7 Teakwood 8 Soft Board 4' x 8' x 4 mm 9 Profil Aluminium "T" 10 Ramset/Dyna Bolt 12 mm (Isi 100 Buah) 11 Kawat Seng Polos 12 Seng Rata / Plat - BJLS 40 KI - BJLS 30 KI - BJLS 27 KI - BJLS 20 KI 13 Plat Asbes - Plat asbes tebal 6 mm - Plat asbes tebal 5 mm - Plat asbes tebal 4 mm 14 Plafon PVC Setara Shunda Plafond 15 Lis Plafond PVC 16 Lis Alumunium Plafon 17 Eternit Asbes Semen 1,00 x 1,00 x 35 mm 18 Eternit Asbes Semen 1,00 x 1,00 x 40 mm 19 Eternit Asbes Semen 1,00 x 1,00 x 50 mm 20 Eternit Asbes Semen 1,00 x 1,00 x 60 mm 21 A sheet 0.4mm PVDF 22 Shadowline
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
M1
80,400.00 134,000.00 19,300.00
103,700.00 172,800.00 24,900.00
107,300.00 178,800.00 25,700.00
Lbr Lbr
391,400.00 180,100.00
504,700.00 232,200.00
522,200.00 240,300.00
594,400.00 273,600.00
603,400.00 277,700.00
Lbr Lbr Lbr Lbr Lbr M1 Box Kg
101,900.00 160,800.00 386,000.00 139,400.00 252,000.00 123,300.00 176,900.00 21,400.00
131,400.00 207,300.00 497,700.00 179,700.00 324,900.00 159,000.00 228,100.00 27,600.00
135,900.00 214,500.00 515,000.00 186,000.00 336,200.00 164,500.00 236,000.00 28,600.00
154,700.00 244,200.00 586,300.00 211,700.00 382,700.00 187,300.00 268,700.00 32,500.00
157,100.00 247,900.00 595,100.00 214,900.00 388,500.00 190,100.00 272,700.00 33,000.00
Lbr Lbr Lbr Lbr
187,700.00 155,500.00 106,200.00 74,000.00
242,000.00 200,500.00 136,900.00 95,400.00
250,400.00 207,500.00 141,700.00 98,700.00
285,100.00 236,200.00 161,300.00 112,400.00
289,300.00 239,700.00 163,700.00 114,100.00
Lbr Lbr Lbr Lbr M' M' Lbr Lbr Lbr Lbr
139,400.00 134,000.00 64,300.00 219,800.00 69,700.00 21,400.00 59,000.00 62,200.00 67,600.00 72,900.00 1,040,100.00 80,400.00
179,700.00 172,800.00 82,900.00 283,400.00 89,900.00 27,600.00 76,100.00 80,200.00 87,100.00 94,000.00 1,341,100.00 103,700.00
186,000.00 178,800.00 85,800.00 293,300.00 93,000.00 28,600.00 78,700.00 83,000.00 90,200.00 97,300.00 1,387,700.00 107,300.00
211,700.00 203,500.00 97,700.00 333,800.00 105,900.00 32,500.00 89,600.00 94,500.00 102,600.00 110,700.00 1,579,700.00 122,100.00
214,900.00 206,600.00 99,100.00 338,900.00 107,500.00 33,000.00 90,900.00 95,900.00 104,200.00 112,400.00 1,603,500.00 124,000.00
Lbr Lbr
M2 M'
122,100.00 203,500.00 29,300.00
138,500.00 206,600.00 29,800.00
9
Halaman 11
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 7.
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
9
Bahan Pipa 1 Pipa Besi - Pipa Besi ½" - 4 m - Pipa Besi ½" - 6 m - Pipa Besi ¾" - 4 m - Pipa Besi 1,5" - 4 m - Pipa Besi 2" - 4 m - Pipa Besi 2,5" - 4 m - Pipa Besi 3" - 4 m - Pipa Besi 4" - 4 m Pipa PCV Tekanan 10 Kg/Cm2, Panjang = 4 Meter - Pipa PVC AW Dia 1/2" - Pipa PVC AW Dia 3/4" - Pipa PVC AW Dia 1" - Pipa PVC AW Dia 1,5 " - Pipa PVC AW Dia 2 " - Pipa PVC AW Dia 2,5 " - Pipa PVC AW Dia 3 " - Pipa PVC AW Dia 4 " 2 Pipa HDPE - Pipa HDPE Ø 25 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 32 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 40 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 50 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 63 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 75 mm, SDR 17 (PN 10/PE100) ` Pipa HDPE Ø 90 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 110 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 125 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 140 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 160 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 180 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 200 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 225 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 250 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 280 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 315 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 355 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 400 mm, SDR 17 (PN 10/PE100)
Btg Btg Btg Btg Btg Btg Btg Btg
96,500.00 109,400.00 116,900.00 214,500.00 289,500.00 537,200.00 621,900.00 632,700.00
124,400.00 141,100.00 150,700.00 276,600.00 373,300.00 692,700.00 801,900.00 815,800.00
128,700.00 145,900.00 156,000.00 286,200.00 386,200.00 716,700.00 829,700.00 844,100.00
146,600.00 166,100.00 177,500.00 325,800.00 439,700.00 815,900.00 944,600.00 960,900.00
148,800.00 168,600.00 180,200.00 330,700.00 446,300.00 828,200.00 958,800.00 975,400.00
Btg Btg Btg Btg Btg Btg Btg Btg
23,600.00 33,200.00 46,100.00 80,400.00 106,200.00 187,700.00 305,600.00 338,800.00
30,400.00 42,800.00 59,400.00 103,700.00 136,900.00 242,000.00 394,000.00 436,900.00
31,500.00 44,300.00 61,500.00 107,300.00 141,700.00 250,400.00 407,700.00 452,000.00
35,800.00 50,400.00 70,000.00 122,100.00 161,300.00 285,100.00 464,100.00 514,600.00
36,400.00 51,200.00 71,100.00 124,000.00 163,700.00 289,300.00 471,100.00 522,300.00
M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1
11,800.00 16,100.00 29,600.00 45,900.00 72,400.00 101,900.00 146,800.00 218,100.00 279,200.00 350,600.00 456,600.00 577,800.00 713,400.00 905,000.00 1,108,800.00 1,393,100.00 1,764,100.00 2,245,100.00 2,837,200.00
15,200.00 20,800.00 38,200.00 59,200.00 93,300.00 131,400.00 189,300.00 281,200.00 360,000.00 452,000.00 588,700.00 745,000.00 919,800.00 1,166,900.00 1,429,700.00 1,796,200.00 2,274,600.00 2,894,800.00 3,658,200.00
15,700.00 21,500.00 39,500.00 61,200.00 96,600.00 136,000.00 195,800.00 291,000.00 372,500.00 467,700.00 609,200.00 770,900.00 951,800.00 1,207,400.00 1,479,300.00 1,858,600.00 2,353,600.00 2,995,300.00 3,785,200.00
17,900.00 24,400.00 44,900.00 69,700.00 109,900.00 154,800.00 222,900.00 331,200.00 424,100.00 532,500.00 693,500.00 877,600.00 1,083,500.00 1,374,500.00 1,684,000.00 2,115,800.00 2,679,300.00 3,409,800.00 4,309,100.00
18,200.00 24,800.00 45,600.00 70,700.00 111,600.00 157,100.00 226,300.00 336,200.00 430,400.00 540,500.00 703,900.00 890,800.00 1,099,800.00 1,395,200.00 1,709,400.00 2,147,700.00 2,719,600.00 3,461,100.00 4,373,900.00
Halaman 12
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1
- Pipa HDPE Ø 450 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 500 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 560 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 630 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 710 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 800 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 900 mm, SDR 17 (PN 10/PE100) - Pipa HDPE Ø 1000 mm, S 8 - SDR 17 (PN 10/PE100) 3 Pipa Galvanis - Pipa Galvanis 1/2" - 6 m (medium A) - Pipa Galvanis 3/4" - 6 m (medium A) - Pipa Galvanis 1" - 6 m (medium A) - Pipa Galvanis 1.5" - 6 m (medium A) - Pipa Galvanis 2" - 6 m (medium A) - Pipa Galvanis 3" - 6 m (medium A) - Pipa Galvanis 4" - 6 m (medium A) 4 Waterstop - Waterstop PVC WSF 150 Lebar 150 mm, Tebal 20 mm - Waterstop PVC WSF 200 Lebar 200 mm, Tebal 20 mm - Waterstop PVC WSF 250 Lebar 250 mm, Tebal 20 mm - Waterstop PVC WSH 150 Lebar 150 mm, Tebal 20 mm - Waterstop PVC WSH 200 Lebar 200 mm, Tebal 20 mm - Waterstop PVC WSH 250 Lebar 250 mm, Tebal 20 mm 8.
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
M1 M1 M1 M1 M1 M1 M1 M1
3,594,400.00 4,428,000.00 5,564,400.00 7,030,900.00 7,288,700.00 11,370,300.00 14,485,700.00 15,272,800.00
4,634,500.00 5,709,400.00 7,174,600.00 9,065,500.00 9,397,900.00 14,660,600.00 18,677,500.00 19,692,400.00
4,795,400.00 5,907,600.00 7,423,700.00 9,380,200.00 9,724,200.00 15,169,600.00 19,326,000.00 20,376,100.00
5,459,200.00 6,725,200.00 8,451,100.00 10,678,500.00 11,070,000.00 17,269,100.00 22,000,800.00 23,196,200.00
5,541,300.00 6,826,400.00 8,578,300.00 10,839,100.00 11,236,600.00 17,528,900.00 22,331,700.00 23,545,200.00
Btg Btg Btg Btg Btg Btg Btg
160,800.00 160,800.00 268,100.00 375,300.00 643,400.00 750,600.00 1,501,200.00
207,300.00 207,300.00 345,700.00 483,900.00 829,600.00 967,800.00 1,935,600.00
214,500.00 214,500.00 357,700.00 500,700.00 858,400.00 1,001,400.00 2,002,800.00
244,200.00 244,200.00 407,200.00 570,000.00 977,200.00 1,140,000.00 2,280,000.00
247,900.00 247,900.00 413,300.00 578,600.00 991,900.00 1,157,200.00 2,314,300.00
M1 M1 M1 M1 M1 M1
118,000.00 150,100.00 193,000.00 253,600.00 271,300.00 300,800.00
152,100.00 193,500.00 248,900.00 327,000.00 349,800.00 387,800.00
157,400.00 200,300.00 257,500.00 338,300.00 361,900.00 401,300.00
179,200.00 228,000.00 293,100.00 385,200.00 412,000.00 456,800.00
181,900.00 231,400.00 297,500.00 391,000.00 418,200.00 463,700.00
Lbr Lbr Lbr Lbr Lbr Lbr Lbr
3,056,100.00 2,412,700.00 1,930,100.00 1,340,400.00 1,125,900.00 911,500.00 697,000.00
3,940,500.00 3,110,900.00 2,488,600.00 1,728,300.00 1,451,700.00 1,175,300.00 898,700.00
4,077,300.00 3,218,900.00 2,575,000.00 1,788,300.00 1,502,100.00 1,216,100.00 929,900.00
4,641,600.00 3,664,400.00 2,931,400.00 2,035,800.00 1,710,000.00 1,384,400.00 1,058,600.00
4,711,400.00 3,719,500.00 2,975,500.00 2,066,400.00 1,735,700.00 1,405,200.00 1,074,500.00
9
Bahan Besi 1 Besi Plat - Besi Plat 12 mm - Besi Plat 10 mm - Besi Plat 8 mm - Besi Plat 6 mm - Besi Plat 5 mm - Besi Plat 4 mm - Besi Plat 3 mm
Halaman 13
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1
2 3 4
5
5 6
- Besi Plat 2 mm - Besi Plat 1 mm Besi Beton Polos Besi Beton Ulir Besi Beton Polos (full) SNI - Besi beton ø 6 ( 5,0 ) x 11,0 m - Besi beton ø 8 ( 6,4 ) x 11,0 m - Besi beton ø 8 ( 7,0 ) x 11,0 m - Besi beton ø 8 ( 8,0 ) x 12,0 m - Besi beton ø 10 ( 8,2 ) x 11,4 m - Besi beton ø 10 ( 8,5 ) x 11,4 m - Besi beton ø 10 ( 9,4 ) x 11,4 m - Besi beton ø 12 ( 10,4 ) x 11,4 m - Besi beton ø 12 ( 10,9 ) x 11,4 m - Besi beton ø 14 ( 12,9 ) x 11,5 m - Besi beton ø 16 ( 13,9 ) x 10,4 m - Besi beton ø 16 ( 14,2 ) x 11,5 m Besi Beton Ulir (full) SNI - Besi beton ø 10 x 12,0 m - Besi beton ø 13 x 12,0 m - Besi beton ø 16 x 12,0 m - Besi beton ø 19 x 12,0 m - Besi beton ø 22 x 12,0 m Besi Tempa Kawat - Kawat Ikat Beton/Bendrat - Kawat Nyamuk Beton - Kawat Nyamuk Almunium - Kawat Nyamuk Plastik - Kawat Duri - Kawat Harmonika (Lubang Kecil) - Kawat Harmonika (Lubang Besar) - Kawat Kasa Ayak 1,5 ´ 0,5 cm - Kawat Kasa Ayak 2 x 2 cm - Kawat Wiremesh M6 - Kawat Wiremesh M5 - Kawat Wiremesh M8 - Kawat Las Listrik - Kawat Burung
3 Lbr Lbr Kg Kg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg M2 Kg M1 M1 M1 M1 M1 M1 M1 M1 Roll Roll Roll Kg Btg
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
482,500.00 364,600.00 24,700.00 26,800.00 51,500.00 26,800.00 37,500.00 36,500.00 36,500.00 55,800.00 55,800.00 55,800.00 85,800.00 94,400.00 123,300.00 150,100.00 150,100.00 59,000.00 59,000.00 155,500.00 268,100.00 375,300.00 439,600.00 241,300.00
622,100.00 470,100.00 31,800.00 34,600.00 66,400.00 34,600.00 48,400.00 47,100.00 47,100.00 71,900.00 71,900.00 71,900.00 110,600.00 121,700.00 159,000.00 193,500.00 193,500.00 76,100.00 76,100.00 200,500.00 345,700.00 483,900.00 566,800.00 311,100.00
643,700.00 486,400.00 32,900.00 35,800.00 68,700.00 35,800.00 50,000.00 48,700.00 48,700.00 74,400.00 74,400.00 74,400.00 114,500.00 125,900.00 164,500.00 200,300.00 200,300.00 78,700.00 78,700.00 207,500.00 357,700.00 500,700.00 586,500.00 321,900.00
732,800.00 553,700.00 37,500.00 40,700.00 78,200.00 40,700.00 57,000.00 55,400.00 55,400.00 84,700.00 84,700.00 84,700.00 130,300.00 143,400.00 187,300.00 228,000.00 228,000.00 89,600.00 89,600.00 236,200.00 407,200.00 570,000.00 667,700.00 366,500.00
743,900.00 562,100.00 38,100.00 41,300.00 79,400.00 41,300.00 57,800.00 56,200.00 56,200.00 86,000.00 86,000.00 86,000.00 132,300.00 145,500.00 190,100.00 231,400.00 231,400.00 90,900.00 90,900.00 239,700.00 413,300.00 578,600.00 677,700.00 372,000.00
24,700.00 37,500.00 22,500.00 26,800.00 96,500.00 21,400.00 42,900.00 51,500.00 44,000.00 4,021,100.00 2,600,300.00 4,021,100.00 2,466,300.00 48,300.00
31,800.00 48,400.00 29,000.00 34,600.00 124,400.00 27,600.00 55,300.00 66,400.00 56,700.00 5,184,700.00 3,352,800.00 5,184,700.00 3,180,000.00 62,300.00
32,900.00 50,000.00 30,000.00 35,800.00 128,700.00 28,600.00 57,200.00 68,700.00 58,700.00 5,364,700.00 3,469,200.00 5,364,700.00 3,290,400.00 64,400.00
37,500.00 57,000.00 34,200.00 40,700.00 146,600.00 32,500.00 65,200.00 78,200.00 66,800.00 6,107,200.00 3,949,300.00 6,107,200.00 3,745,800.00 73,300.00
38,100.00 57,800.00 34,700.00 41,300.00 148,800.00 33,000.00 66,100.00 79,400.00 67,800.00 6,199,100.00 4,008,700.00 6,199,100.00 3,802,100.00 74,400.00
9
Halaman 14
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 7 8 9 10 11 12 13 14 15 16 17 18 19 19 19 19 20 21 22 23 24 25
26 27 28 28 29
Teralis Motif / Besi Tempa Pagar BRC 120 cm x 240 cm dia. Kawat 6 mm Baja Profil Baja WF Glass bit kawat beronjong Besi Strip Besi Siku Besi Scuare Tube Besi Lis Kaca Aluminium Strip Formite / Penjaga jarak bekisting / Spacer Pintu Besi Baja Jendela Besi Kusen Almunium Rangka Jendela Almunium Rangka Pintu Almunium Rolling Door Besi Bondek 7.5mm Rolling Door Aluminium Folding Gate Sunscreen Aluminium Talang - Talang 30 cm - Talang 40 cm - Talang 45 cm - Talang 50 cm - Talang 60 cm - Talang 90 cm Besi Hollow 2 x 2 Besi Hollow 2 x 4 Besi Hollow 4 x 4 Besi Hollow 5 x 10 HB 250 x 250 x 9 x14
3 M2 M1 Kg Kg Bh Kg Kg
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
M2 M2 M2
1,501,200.00 949,000.00 31,100.00 16,100.00 27,900.00 23,600.00 26,800.00 107,200.00 92,200.00 78,300.00 32,200.00 90,100.00 495,400.00 96,500.00 101,900.00 112,600.00 388,200.00 214,500.00 502,900.00 502,900.00 1,201,000.00
1,935,600.00 1,223,600.00 40,100.00 20,800.00 36,000.00 30,400.00 34,600.00 138,200.00 118,900.00 101,000.00 41,500.00 116,200.00 638,800.00 124,400.00 131,400.00 145,200.00 500,500.00 276,600.00 648,400.00 648,400.00 1,548,500.00
2,002,800.00 1,266,100.00 41,500.00 21,500.00 37,200.00 31,500.00 35,800.00 143,000.00 123,000.00 104,500.00 42,900.00 120,200.00 660,900.00 128,700.00 135,900.00 150,200.00 517,900.00 286,200.00 670,900.00 670,900.00 1,602,300.00
2,280,000.00 1,441,300.00 47,200.00 24,400.00 42,400.00 35,800.00 40,700.00 162,800.00 140,000.00 118,900.00 48,900.00 136,800.00 752,400.00 146,600.00 154,700.00 171,000.00 589,600.00 325,800.00 763,800.00 763,800.00 1,824,100.00
2,314,300.00 1,463,000.00 47,900.00 24,800.00 43,000.00 36,400.00 41,300.00 165,300.00 142,100.00 120,700.00 49,600.00 138,900.00 763,700.00 148,800.00 157,100.00 173,600.00 598,400.00 330,700.00 775,300.00 775,300.00 1,851,500.00
M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 Kg
10,700.00 12,900.00 16,100.00 19,300.00 21,400.00 32,200.00 12,900.00 16,400.00 18,800.00 39,700.00 29,600.00
13,800.00 16,600.00 20,800.00 24,900.00 27,600.00 41,500.00 16,600.00 21,100.00 24,200.00 51,200.00 38,200.00
14,300.00 17,200.00 21,500.00 25,700.00 28,600.00 42,900.00 17,200.00 21,900.00 25,100.00 53,000.00 39,500.00
16,300.00 19,600.00 24,400.00 29,300.00 32,500.00 48,900.00 19,600.00 24,900.00 28,500.00 60,300.00 45,000.00
16,500.00 19,900.00 24,800.00 29,800.00 33,000.00 49,600.00 19,900.00 25,300.00 29,000.00 61,200.00 45,600.00
M1 M1 Bh M1 M1 M2 M1 M1 M1 M2 Lbr
9
Halaman 15
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 30 31 32 33 34 35 36 37 9.
WF 250 x 125 x 6 x 9 WF 150 x 75 x 5 x 7 C 125 x 50 x 20 x 2.3 Trekstang BB dia. 12 mm Plat 12 mm Plat 10 mm Plat 8 mm Plat 6 mm
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
Kg Kg Kg Kg Kg Kg Kg Kg
29,600.00 29,600.00 29,600.00 29,600.00 29,600.00 29,600.00 29,600.00 29,600.00
38,200.00 38,200.00 38,200.00 38,200.00 38,200.00 38,200.00 38,200.00 38,200.00
39,500.00 39,500.00 39,500.00 39,500.00 39,500.00 39,500.00 39,500.00 39,500.00
45,000.00 45,000.00 45,000.00 45,000.00 45,000.00 45,000.00 45,000.00 45,000.00
45,600.00 45,600.00 45,600.00 45,600.00 45,600.00 45,600.00 45,600.00 45,600.00
M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M²
268,100.00 139,400.00 107,200.00 53,600.00 59,000.00 48,300.00 75,100.00 80,400.00 91,100.00 59,000.00 64,300.00 53,600.00 66,600.00 80,400.00 146,400.00 134,700.00 62,200.00 80,600.00 72,900.00 133,200.00 152,500.00 762,100.00 66,600.00
345,700.00 179,700.00 138,200.00 69,100.00 76,100.00 62,300.00 96,800.00 103,700.00 117,500.00 76,100.00 82,900.00 69,100.00 85,900.00 103,700.00 188,800.00 173,700.00 80,200.00 103,900.00 94,000.00 171,700.00 196,600.00 982,600.00 85,900.00
357,700.00 186,000.00 143,000.00 71,500.00 78,700.00 64,400.00 100,200.00 107,300.00 121,600.00 78,700.00 85,800.00 71,500.00 88,900.00 107,300.00 195,300.00 179,700.00 83,000.00 107,500.00 97,200.00 177,700.00 203,500.00 1,016,700.00 88,900.00
407,200.00 211,700.00 162,800.00 81,400.00 89,600.00 73,300.00 114,000.00 122,100.00 138,400.00 89,600.00 97,700.00 81,400.00 101,100.00 122,100.00 222,300.00 204,600.00 94,500.00 122,400.00 110,700.00 202,300.00 231,600.00 1,157,500.00 101,100.00
413,300.00 214,900.00 165,300.00 82,600.00 90,900.00 74,400.00 115,800.00 124,000.00 140,500.00 90,900.00 99,100.00 82,600.00 102,700.00 124,000.00 225,700.00 207,600.00 95,900.00 124,300.00 112,400.00 205,300.00 235,100.00 1,174,900.00 102,700.00
9
Bahan Lantai 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Ubin Tegel Polos 20 x 20 cm Ubin Tegel Polos 30 x 30 cm Ubin Tegel Polos 40 x 40 cm Plint Ubin PC Abu-abu 15 x 20 Plint Ubin PC Abu-abu 10 x 30 Plint Ubin PC Abu-abu 10 x 40 Ubin Tegel Warna 20 x 20 cm Ubin Tegel Warna 30 x 30 cm Ubin Tegel Warna 40 x 40 cm Plint Ubin PC Warna 10 x 20 Plint Ubin PC Warna 10 x 30 Plint Ubin PC Warna 10 x 40 Keramik 33 x 33 cm (Ex. Milan) Keramik 20 x 20 cm (Ex. Roman) Keramik 10 x 33 cm Keramik 30 x 30 cm (Ex. Roman) Keramik 30 x 30 cm (Ex. Platinum) Keramik 40 x 40 cm (Ex. Milan) Keramik 40 x 40 cm (Ex. Hercules) Keramik Dinding 20 x 20 cm (Ex. Roman) Keramik Dinding 30 x 30 cm (Ex. Roman) Keramik Lantai 10 x 20 cm (Ex. Roman) Keramik Lantai 20 x 20 cm (Ex. Platinum)
Halaman 16
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
Plint Keramik 5 x 20 Plint Keramik 10 x 10 Plint Keramik 10 x 20 Plint Keramik 10 x 30 Plint Keramik 10 x 40 Marmer Biasa Ubin Teralux 30 x 30 cm Ubin Teralux 40 x 40 cm Plint Teralux 10 x 30 Plint Teralux 10 x 40 Ubin Teralux marmer 30 x 30 cm Ubin Teralux marmer 40 x 40 cm Ubin Teralux marmer 60 x 60 cm Plint Teralux marmer 10 x 30 Plint Teralux marmer 10 x 40 Plint Teralux marmer 10 x 60 Ubin Porselin Putih Lokal 11 x 11 cm Ubin Porselin Putih Lokal 10 x 20 cm Ubin Porselin Putih Warna 10 x 20 cm Ubin Porselin Putih Lokal 20 x 20 cm Ubin Porselin Putih Warna 20 x 20 cm Granite tile 30 x 30 Granite tile 40 x 40 Homogenius Tile Lantai 60 x 60 (Ex. Niro) Homogenius Tile Lantai 60 x 60 (Ex. Indogress) Plint Granite 10 x 30 Plint Granite 10 x 40 Plint Granite 10 x 60 Hollow Blok Concrete block (CB.20) Concrete block (CB.15) Concrete block (CB.10) Bondbeam 40 x 20 x 20 cm Roster / Terawang 40 x 40 x 11 Roster / Terawang 12 x 11 x 24 Bathquip Karpet Underlayer / rubber corrugated Parquet
3 M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M² M3 M4 M5 M6 Bh Bh Bh Bh M² M² M²
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4 38,600.00 40,700.00 48,300.00 55,800.00 63,300.00 938,300.00 445,000.00 47,700.00 57,900.00 72,900.00 493,300.00 512,600.00 563,000.00 12,300.00 155,500.00 203,700.00 11,600.00 84,700.00 126,500.00 128,700.00 130,800.00 426,800.00 534,000.00 266,400.00 579,000.00 59,000.00 65,400.00 81,600.00 8,000.00 8,600.00 8,600.00 8,600.00 9,100.00 42,900.00 26,800.00 1,394,000.00 160,800.00 235,900.00 235,900.00
5 49,800.00 52,500.00 62,300.00 71,900.00 81,600.00 1,209,800.00 573,800.00 61,500.00 74,700.00 94,000.00 636,000.00 660,900.00 725,900.00 15,900.00 200,500.00 262,700.00 15,000.00 109,200.00 163,100.00 165,900.00 168,700.00 550,300.00 688,500.00 343,500.00 746,600.00 76,100.00 84,300.00 105,200.00 10,300.00 11,100.00 11,100.00 11,100.00 11,700.00 55,300.00 34,600.00 1,797,400.00 207,300.00 304,200.00 304,200.00
6 51,500.00 54,300.00 64,400.00 74,400.00 84,400.00 1,251,800.00 593,700.00 63,600.00 77,200.00 97,300.00 658,100.00 683,900.00 751,100.00 16,400.00 207,500.00 271,800.00 15,500.00 113,000.00 168,800.00 171,700.00 174,500.00 569,400.00 712,400.00 355,400.00 772,500.00 78,700.00 87,300.00 108,900.00 10,700.00 11,500.00 11,500.00 11,500.00 12,100.00 57,200.00 35,800.00 1,859,800.00 214,500.00 314,700.00 314,700.00
7 58,600.00 61,800.00 73,300.00 84,700.00 96,100.00 1,425,100.00 675,900.00 72,500.00 87,900.00 110,700.00 749,200.00 778,500.00 855,100.00 18,700.00 236,200.00 309,400.00 17,600.00 128,600.00 192,100.00 195,500.00 198,700.00 648,200.00 811,000.00 404,600.00 879,400.00 89,600.00 99,300.00 123,900.00 12,200.00 13,100.00 13,100.00 13,100.00 13,800.00 65,200.00 40,700.00 2,117,200.00 244,200.00 358,300.00 358,300.00
Keterangan Zona V 8
9
59,500.00 62,800.00 74,400.00 86,000.00 97,600.00 1,446,500.00 686,000.00 73,500.00 89,300.00 112,400.00 760,500.00 790,200.00 867,900.00 19,000.00 239,700.00 314,100.00 17,900.00 130,600.00 195,000.00 198,400.00 201,700.00 658,000.00 823,200.00 410,700.00 892,600.00 90,900.00 100,800.00 125,800.00 12,400.00 13,200.00 13,200.00 13,200.00 14,000.00 66,100.00 41,300.00 2,149,000.00 247,900.00 363,700.00 363,700.00
Halaman 17
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 62 63 64 66 67 68
Gymfloor Batu Granite Batu Teraso Vinyl motif kembang ex DN Vinyl wall covering, lebar 50 cm Floor Hardener ferrovax
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
M² Kg Kg Bh Bh Kg
235,900.00 42,900.00 34,300.00 75,100.00 104,000.00 61,100.00
304,200.00 55,300.00 44,200.00 96,800.00 134,100.00 78,800.00
314,700.00 57,200.00 45,800.00 100,200.00 138,800.00 81,500.00
358,300.00 65,200.00 52,100.00 114,000.00 158,000.00 92,800.00
363,700.00 66,100.00 52,900.00 115,800.00 160,300.00 94,200.00
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
332,400.00 198,400.00 268,100.00 412,800.00 1,930,100.00 3,190,100.00 402,100.00 536,200.00 1,179,500.00 482,500.00 1,447,600.00 198,400.00 643,400.00 589,800.00 536,200.00 563,000.00 418,200.00 1,018,700.00 1,154,100.00 94,400.00 100,300.00 471,800.00 1,769,300.00
428,600.00 255,800.00 345,700.00 532,300.00 2,488,600.00 4,113,200.00 518,500.00 691,400.00 1,520,800.00 622,100.00 1,866,500.00 255,800.00 829,600.00 760,500.00 691,400.00 725,900.00 539,200.00 1,313,500.00 1,488,100.00 121,700.00 129,300.00 608,300.00 2,281,300.00
443,500.00 264,700.00 357,700.00 550,700.00 2,575,000.00 4,256,000.00 536,500.00 715,400.00 1,573,600.00 643,700.00 1,931,300.00 264,700.00 858,400.00 786,900.00 715,400.00 751,100.00 557,900.00 1,359,100.00 1,539,700.00 125,900.00 133,800.00 629,500.00 2,360,500.00
504,900.00 301,300.00 407,200.00 627,000.00 2,931,400.00 4,845,100.00 610,700.00 814,400.00 1,791,400.00 732,800.00 2,198,600.00 301,300.00 977,200.00 895,800.00 814,400.00 855,100.00 635,200.00 1,547,200.00 1,752,800.00 143,400.00 152,300.00 716,600.00 2,687,200.00
512,400.00 305,800.00 413,300.00 636,400.00 2,975,500.00 4,918,000.00 619,900.00 826,600.00 1,818,400.00 743,900.00 2,231,700.00 305,800.00 991,900.00 909,200.00 826,600.00 867,900.00 644,700.00 1,570,500.00 1,779,200.00 145,500.00 154,600.00 727,400.00 2,727,600.00
9
10. Bahan Sanitair 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 15 15 18 19 20 21
Klosed Jongkok KIA Klosed Jongkok American Standart Klosed Jongkok (teraso) Klosed Jongkok (Ex. Toto) Klosed Duduk (Ex. Serity) Klosed Duduk (Ex. Toto) Bak Mandi Fibre (besar) Bak Mandi Porselin (besar) Bak Mandi Plastik (besar) Bak Mandi (teraso) Urinoir (Ex. Toto) Bak Cuci Piring Logam Bak Cuci Piring Stenless Stell Bak Cuci Piring Teraso Pompa Air (Ex. Sanyo ) Pompa Air (Ex. Shimzu ) Pompa Air (Ex. Panasonic) Mesin Jet Pump Kap 250 watt Mesin Jet Pump Tekan Kap 150 watt Floor Drain (Ex. Toto) Kran Air (Ex. Toto) Roof Drain 4 In Kran Shower Panas Dan Dingin (Ex. Toto)
Halaman 18
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 21 Shower Spray 21 Pelampung Otomatis 22 Kran Air Dapur (Ex. Toto) 22 Tempat Sabun 23 Jet Shower (Ex. Toto) 24 Wastafel (Ex. Toto) 25 Tandon Air 650 L (Ex. Grand) 26 Tandon Air 1000 L (Ex. Grand) 27 Tandon Air 1200 L (Ex. Grand) 28 Tissue Holder (Ex. Toto) 29 Roof Tank 2200 Ltr Stainless Stell 30 Roof Tank 2200 Ltr Fiber 11. Bahan Paku 1 2 3 4 5 6 7
Paku Kayu 0.5" - 1.5" / 1 - 2.5 cm Paku Kayu 2" - 6" / 5 - 7 cm Paku Beton Paku Ulin 1" Paku Ulin 1.5" - 5" Paku Seng Paku Plywood
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
194,100.00 26,800.00 483,600.00 47,200.00 1,159,500.00 3,007,800.00 991,900.00 1,474,400.00 2,734,400.00 418,700.00 10,696,200.00 4,396,400.00
250,300.00 34,600.00 623,500.00 60,900.00 1,495,000.00 3,878,200.00 1,278,900.00 1,901,100.00 3,525,700.00 539,900.00 13,791,400.00 5,668,600.00
259,000.00 35,800.00 645,200.00 63,000.00 1,546,900.00 4,012,800.00 1,323,300.00 1,967,100.00 3,648,100.00 558,600.00 14,270,200.00 5,865,400.00
294,800.00 40,700.00 734,500.00 71,700.00 1,761,000.00 4,568,200.00 1,506,500.00 2,239,300.00 4,153,000.00 635,900.00 16,245,300.00 6,677,200.00
299,200.00 41,300.00 745,500.00 72,800.00 1,787,500.00 4,636,900.00 1,529,100.00 2,273,000.00 4,215,400.00 645,500.00 16,489,700.00 6,777,700.00
Kg Kg Kg Kg Kg Kg Kg
20,400.00 20,400.00 26,800.00 21,400.00 21,400.00 23,600.00 21,400.00
26,300.00 26,300.00 34,600.00 27,600.00 27,600.00 30,400.00 27,600.00
27,200.00 27,200.00 35,800.00 28,600.00 28,600.00 31,500.00 28,600.00
31,000.00 31,000.00 40,700.00 32,500.00 32,500.00 35,800.00 32,500.00
31,400.00 31,400.00 41,300.00 33,000.00 33,000.00 36,400.00 33,000.00
9
Halaman 19
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Paku Sekrup Paku Sekrup 1 - 2.5 cm Paku Asbes Paku Sirap Paku Gypsum Paku Kait Paku Sumbet Paku Reng Paku Genteng Metal Paku Pancing 60 x 230 Paku Pancing 50 x 231 Paku Hak Panjang 15 cm Paku 12 cm Paku 10 cm Baut Sekrup Fixer
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
Kg Bh Kg Kg Kg Bh Bh Kg Kg Kg Kg Kg Kg Kg Kg Bh
32,200.00 26,800.00 12,900.00 32,200.00 37,500.00 6,400.00 32,200.00 20,400.00 23,600.00 42,900.00 48,300.00 56,800.00 53,600.00 48,300.00 42,900.00 3,200.00
41,500.00 34,600.00 16,600.00 41,500.00 48,400.00 8,300.00 41,500.00 26,300.00 30,400.00 55,300.00 62,300.00 73,200.00 69,100.00 62,300.00 55,300.00 4,100.00
42,900.00 35,800.00 17,200.00 42,900.00 50,000.00 8,500.00 42,900.00 27,200.00 31,500.00 57,200.00 64,400.00 75,800.00 71,500.00 64,400.00 57,200.00 4,300.00
48,900.00 40,700.00 19,600.00 48,900.00 57,000.00 9,700.00 48,900.00 31,000.00 35,800.00 65,200.00 73,300.00 86,300.00 81,400.00 73,300.00 65,200.00 4,900.00
49,600.00 41,300.00 19,900.00 49,600.00 57,800.00 9,900.00 49,600.00 31,400.00 36,400.00 66,100.00 74,400.00 87,600.00 82,600.00 74,400.00 66,100.00 4,900.00
Bh Bh Bh Bh Bh Bh
91,100.00 117,700.00 152,600.00 208,300.00 214,500.00 383,900.00
117,500.00 151,700.00 196,700.00 268,600.00 276,600.00 495,000.00
121,600.00 157,000.00 203,600.00 277,900.00 286,200.00 512,200.00
138,400.00 178,700.00 231,700.00 316,400.00 325,800.00 583,100.00
140,500.00 181,400.00 235,200.00 321,100.00 330,700.00 591,900.00
9
12. Bahan Gorong-gorong 1 2 3 4 5 6
Buis Beton 10 cm x 1 m Buis Beton 15 cm x 1 m Buis Beton 20 cm x 1 m Buis Beton 25 cm x 1 m Buis Beton 50 cm x 1 m Buis Beton 100 cm x 1 m
Halaman 20
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
9
13. Bahan Kayu 1 Kayu Kelas I setara Ulin - Balok - Papan - Papan Siring Pagar 2 Kayu kelas II Setara Bengkirai - Balok - Papan 3 Kayu Kelas III Setara Meranti - Balok - Papan 4 Kayu Kelas III Setara Kapur - Balok - Papan 4 Kayu Kelas IV Setara Terantang - Balok - Papan 5 Kusen Kayu KI. I ( Setara Jati/Ulin) 6 Kusen Kayu KI. II (Setara Bengkirai/Kamper/Kruing) 7 Papan Kayu KI. 1 (Setara Jati/Ulin) 8 Papan Kayu KI. II (Setara Bengkirai/ Kamper/Kruing) 9 Papan Bauwplank Kelas III 10 Papan Listplank Kelas III 11 Papan Begisting Kelas II 12 Kayu Rangka Plafond 13 Kayu Rangka Atap 14 Kayu Reng 2/3 - 4 m 15 Kayu Reng 3/4 - 4 m 16 Kayu Gelagar 8/10 - 4 m 17 Kayu Begisting 18 Kayu Lumbresiring 19 Louvre 20 Kayu Kaso 5/7 (meranti) 21 Kayu Kaso 5/7 (meranti) 22 Kayu Terentang (meranti) 23 Kayu Cetakan 24 List Kayu profil 5/5 25 List Kayu profil 4/4 26 List Kayu profil 2/4
M³ M³ Kpj
6,298,100.00 6,870,600.00 45,812.00
5,900,400.00 6,436,800.00 42,912.00
5,900,400.00 6,436,800.00 42,912.00
5,900,400.00 6,436,800.00 42,912.00
6,916,317.76 7,545,073.92 50,300.49
M³ M³
4,007,900.00 4,007,900.00
3,754,800.00 3,754,800.00
3,754,800.00 3,754,800.00
3,754,800.00 3,754,800.00
4,401,293.12 4,401,293.12
M³ M³
2,862,800.00 2,862,800.00
2,682,000.00 2,682,000.00
2,682,000.00 2,682,000.00
2,682,000.00 2,682,000.00
3,143,780.80 3,143,780.80
M³ M³
2,862,800.00 2,862,800.00
2,682,000.00 2,682,000.00
2,682,000.00 2,682,000.00
2,682,000.00 2,682,000.00
3,143,780.80 3,143,780.80
M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ M³ Btg Unit M³ Btg M³ M³ M' M' M³
2,748,220.00 2,748,220.00 4,007,900.00 2,290,200.00 5,725,500.00 4,007,900.00 2,862,800.00 2,862,800.00 4,007,900.00 2,862,800.00 2,862,800.00 3,206,240.00 3,320,820.00 3,778,840.00 2,061,140.00 45,812.00 1,202,340.00 2,862,800.00 40,048.00 2,862,800.00 2,748,220.00 22,856.00 22,856.00 17,192.00
2,574,720.00 2,574,720.00 3,754,800.00 2,145,600.00 5,364,000.00 3,754,800.00 2,682,000.00 2,682,000.00 3,754,800.00 2,682,000.00 2,682,000.00 3,003,840.00 3,111,120.00 3,540,240.00 1,931,040.00 42,912.00 1,126,440.00 2,682,000.00 37,548.00 2,682,000.00 2,574,720.00 21,456.00 21,456.00 16,092.00
2,574,720.00 2,574,720.00 3,754,800.00 2,145,600.00 5,364,000.00 3,754,800.00 2,682,000.00 2,682,000.00 3,754,800.00 2,682,000.00 2,682,000.00 3,003,840.00 3,111,120.00 3,540,240.00 1,931,040.00 42,912.00 1,126,440.00 2,682,000.00 37,548.00 2,682,000.00 2,574,720.00 21,456.00 21,456.00 16,092.00
2,574,720.00 2,574,720.00 3,754,800.00 2,145,600.00 5,364,000.00 3,754,800.00 2,682,000.00 2,682,000.00 3,754,800.00 2,682,000.00 2,682,000.00 3,003,840.00 3,111,120.00 3,540,240.00 1,931,040.00 42,912.00 1,126,440.00 2,682,000.00 37,548.00 2,682,000.00 2,574,720.00 21,456.00 21,456.00 16,092.00
3,018,029.57 3,018,029.57 4,401,293.12 2,515,024.64 6,287,561.60 4,401,293.12 3,143,780.80 3,143,780.80 4,401,293.12 3,143,780.80 3,143,780.80 3,521,034.50 3,646,785.73 4,149,790.66 2,263,522.18 50,300.49 1,320,387.94 3,143,780.80 44,012.93 3,143,780.80 3,018,029.57 25,150.25 25,150.25 18,862.68
Halaman 21
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 27 28 29 30 31
Dolken Kayu Galam Perancah Kayu Alang-alang Bambu Bilik Bambu
3 Btg M³ Ikat Btg
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
M2
80,196.00 2,061,140.00 58,412.80 21,783.20 217,532.00
75,096.00 1,931,040.00 54,712.80 20,383.20 203,832.00
75,096.00 1,931,040.00 54,712.80 20,383.20 203,832.00
75,096.00 1,931,040.00 54,712.80 20,383.20 203,832.00
88,025.86 2,263,522.18 64,133.13 23,892.73 238,927.34
Lbr Kg Kg Kg Kg Kg Ltr Ltr Ltr Kg Kg Kg Klg Kg Kg Kg Kg Kg Ltr Ltr Ltr Ltr Ltr Ltr Kg Ltr Ltr Kg Kg Kg Kg Ltr
5,400.00 50,700.00 50,700.00 21,400.00 22,500.00 34,300.00 36,500.00 31,100.00 26,800.00 160,800.00 26,800.00 101,900.00 107,200.00 105,100.00 118,000.00 83,600.00 22,500.00 53,100.00 144,800.00 160,800.00 35,400.00 75,100.00 69,700.00 59,000.00 53,600.00 57,900.00 53,600.00 64,300.00 59,000.00 80,400.00 157,600.00 34,300.00
7,000.00 65,400.00 65,400.00 27,600.00 29,000.00 44,200.00 47,100.00 40,100.00 34,600.00 207,300.00 34,600.00 131,400.00 138,200.00 135,500.00 152,100.00 107,800.00 29,000.00 68,500.00 186,700.00 207,300.00 45,600.00 96,800.00 89,900.00 76,100.00 69,100.00 74,700.00 69,100.00 82,900.00 76,100.00 103,700.00 203,200.00 44,200.00
7,200.00 67,600.00 67,600.00 28,600.00 30,000.00 45,800.00 48,700.00 41,500.00 35,800.00 214,500.00 35,800.00 135,900.00 143,000.00 140,200.00 157,400.00 111,500.00 30,000.00 70,800.00 193,200.00 214,500.00 47,200.00 100,200.00 93,000.00 78,700.00 71,500.00 77,200.00 71,500.00 85,800.00 78,700.00 107,300.00 210,300.00 45,800.00
8,200.00 77,000.00 77,000.00 32,500.00 34,200.00 52,100.00 55,400.00 47,200.00 40,700.00 244,200.00 40,700.00 154,700.00 162,800.00 159,600.00 179,200.00 127,000.00 34,200.00 80,600.00 219,900.00 244,200.00 53,800.00 114,000.00 105,900.00 89,600.00 81,400.00 87,900.00 81,400.00 97,700.00 89,600.00 122,100.00 239,400.00 52,100.00
8,300.00 78,100.00 78,100.00 33,000.00 34,700.00 52,900.00 56,200.00 47,900.00 41,300.00 247,900.00 41,300.00 157,100.00 165,300.00 162,000.00 181,900.00 128,900.00 34,700.00 81,800.00 223,200.00 247,900.00 54,600.00 115,800.00 107,500.00 90,900.00 82,600.00 89,300.00 82,600.00 99,100.00 90,900.00 124,000.00 243,000.00 52,900.00
9
14. Bahan Finishing 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Amplas Kayu Meni Kayu Meni Besi Dempul Kayu Plamir Tembok Plamir Kayu Tiner A Special Tiner B Special Tiner A Biasa Cat Dasar Tembok Cat Dasar Kayu (Ex. Dulux) Cat Dasar Besi (Ex. Ftalit) Cat Tembok 5 Kg (Ex. Paragon) Cat Tembok Dalam ( Ex. Mowilex) Cat Tembok Luar ( Ex. Mowilex) Undercoat Cat Seng Zincromate Alkali Primer Alkali Killer Wood Filler (dempul melamin) Wood Staind Sanding Clear Doop Flincote Vernis Teak Oil Water Profing Lem Kayu Lem Vinyl Lem Aibon Sealent
Halaman 22
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 33 34 35 36 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
Formika Vinyl Karet 30 x 30 kwl Vinyl Karet 15 x 30 kwl Seal Tape Wallpaper Minyak Bekisting Residu Aspal Soda Api Kapur Tembok Pembersih Lantai Air Kapur Sirih Kalkarium Tepung Gypsum Politur Solar Minyak Pelumas Tali Ijuk Minyak Tanah Bensin
3 Ltr Bh Bh Bh M2 Ltr Ltr Drum Kg Kaleng Ltr Ltr Kg Kg Kg Ltr Ltr Ltr Kg Ltr Ltr
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4 375,300.00 37,500.00 26,800.00 16,100.00 107,200.00 42,400.00 42,900.00 1,876,500.00 32,200.00 24,700.00 22,500.00 100.00 41,800.00 91,100.00 85,800.00 57,900.00 8,000.00 75,100.00 42,900.00 12,900.00 9,700.00
5 483,900.00 48,400.00 34,600.00 20,800.00 138,200.00 54,700.00 55,300.00 2,419,500.00 41,500.00 31,800.00 29,000.00 100.00 53,900.00 117,500.00 110,600.00 74,700.00 10,300.00 96,800.00 55,300.00 16,600.00 11,800.00
6 500,700.00 50,000.00 35,800.00 21,500.00 143,000.00 56,600.00 57,200.00 2,503,500.00 42,900.00 32,900.00 30,000.00 100.00 55,800.00 121,600.00 114,500.00 77,200.00 10,700.00 100,200.00 57,200.00 17,200.00 12,200.00
7 570,000.00 57,000.00 40,700.00 24,400.00 162,800.00 64,400.00 65,200.00 2,850,000.00 48,900.00 37,500.00 34,200.00 200.00 63,500.00 138,400.00 130,300.00 87,900.00 12,200.00 114,000.00 65,200.00 19,600.00 14,000.00
Keterangan Zona V 8
9
578,600.00 57,800.00 41,300.00 24,800.00 165,300.00 65,300.00 66,100.00 2,892,900.00 49,600.00 38,100.00 34,700.00 200.00 64,500.00 140,500.00 132,300.00 89,300.00 12,400.00 115,800.00 66,100.00 19,900.00 14,200.00
Halaman 23
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
2
1 15.
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
9
Pondasi 1 2 3 4 5 6 7 8 9 10 11
Mini Pile 20 X 20 (Segiempat) f'c 40 Mpa (K - 500), Pijin = 30 ton Mini Pile 25 X 25 (Segiempat) f'c 40 Mpa (K - 500), Pijin = 40 ton Mini Pile 30 X 30 (Segiempat) f'c 40 Mpa (K - 500), Pijin = 40 ton Mini Pile 28 X 28 (Segitiga) f'c 40 Mpa (K - 500), Pijin = 40 ton Mini Pile 32 X 32 (Segitiga) f'c 40 Mpa (K - 500), Pijin = 40 ton Pancang Diameter 30 cm ( bulat ) Pancang Diameter 35 cm ( bulat ) Pancang Diameter 40 cm ( bulat ) Pancang Diameter 45 cm ( bulat ) Pancang Diameter 50 cm ( bulat ) Pancang Diameter 60 cm ( bulat )
M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1
536,200.00 713,100.00 1,179,500.00 514,700.00 611,200.00 482,500.00 638,000.00 825,700.00 1,286,800.00 1,474,400.00 1,694,200.00
691,400.00 919,400.00 1,520,800.00 663,600.00 788,100.00 622,100.00 822,600.00 1,064,600.00 1,659,200.00 1,901,100.00 2,184,500.00
715,400.00 951,400.00 1,573,600.00 686,700.00 815,400.00 643,700.00 851,200.00 1,101,600.00 1,716,800.00 1,967,100.00 2,260,300.00
814,400.00 1,083,000.00 1,791,400.00 781,700.00 928,300.00 732,800.00 969,000.00 1,254,100.00 1,954,400.00 2,239,300.00 2,573,200.00
826,600.00 1,099,300.00 1,818,400.00 793,500.00 942,300.00 743,900.00 983,600.00 1,272,900.00 1,983,800.00 2,273,000.00 2,611,900.00
M3 M3 M3 M3 M3 M3 M3 M3 M3
461,100.00 450,400.00 461,100.00 450,400.00 455,700.00 509,300.00 477,200.00 426,800.00 64,300.00
594,500.00 580,700.00 594,500.00 580,700.00 587,600.00 656,700.00 615,300.00 550,300.00 82,900.00
615,200.00 600,900.00 615,200.00 600,900.00 608,000.00 679,500.00 636,600.00 569,400.00 85,800.00
700,300.00 684,000.00 700,300.00 684,000.00 692,100.00 773,500.00 724,800.00 648,200.00 97,700.00
710,800.00 694,300.00 710,800.00 694,300.00 702,500.00 785,200.00 735,700.00 658,000.00 99,100.00
M2
1,045,500.00
1,348,000.00
1,394,800.00
1,587,900.00
1,611,800.00
M' M' M'
965,100.00 366,700.00 263,800.00
1,244,400.00 472,800.00 340,100.00
1,287,600.00 489,200.00 351,900.00
1,465,800.00 557,000.00 400,600.00
1,487,800.00 565,300.00 406,700.00
Bh Bh
3,570,800.00 5,275,700.00
4,604,100.00 6,802,400.00
4,763,900.00 7,038,500.00
5,423,300.00 8,012,700.00
5,504,900.00 8,133,200.00
Lbr
6,400.00
8,300.00
8,500.00
9,700.00
9,900.00
M' M' M'
31,800.00 31,800.00 34,000.00
41,000.00 41,000.00 43,800.00
42,400.00 42,400.00 45,400.00
48,300.00 48,300.00 51,600.00
49,000.00 49,000.00 52,400.00
16 Bahan Lainnya A.
Agregat 1 Agregat halus untuk ATB 2 Agregat halus untuk Pondasi 3 Agregat kasar untuk ATB 4 Agregat kasar untuk Pondasi 5 Agregat halus untuk Beton 6 Agregat Kelas A 7 Agregat Kelas B 8 Agregat Kelas C 9 Agregat Kelas S B. A 10 A sheet 0.4mm PVDF C. HPL 11 Taco HPL - enginered veener 12 HPL Artform - wood finish 13 Taco HPL - solid brush D. Tandon Air / Toren 14 Tandon Air 2200 L (Ex. Penguin) 15 Tandon Air 5200 L (Ex. Grand) E. Amplas 16 Amplas Besi F. Plafond 17 Plat Gloss White 0,8 mm x 20 cm (Ex. Shunda Plafond) 18 Plat Doff White 0,8 mm x 20 cm (Ex. Shunda Plafond) 19 Drain Gloss Brown Wood Grain 0,8 mm x 20 cm (Ex. Shunda Plafond)
Halaman 24
I.1 HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR TAHUN 2018 * HARGA SATUAN BELUM TERMASUK KEUNTUNGAN MAKSIMAL 15 % SESUAI PERPRES 70 PASAL 66 AYAT 8 DAN PERKA LKPP 14/2012 JUKNIS PERPRES 70
No.
Uraian Pokok Kegiatan
Satuan Zona I
1
2
20 Plat Gloss White Bubble 0,8 mm x 20 cm (Ex. Shunda Plafond) 21 Plat Gloss Brown Leaf 0,8 mm x 20 cm (Ex. Shunda Plafond) 22 Plafond Khusus 0,8 mm x 25 cm (Ex. Shunda Plafond) 23 High Quality Plafond 0,8 mm x 30 cm (Ex. Shunda Plafond) G. Cat 24 Cat Tembok setara Dulux 2,5 Liter 25 Cat Tembok setara Catylac 5 Kg 26 Cat Tembok setara Nippon Paint 2,5 Liter H. Gypsum 27 Gypsum (Ex. Jayaboard 9 mm (1.20×2.40) 28 Gypsum (Ex. Elephant 9 mm (1.20×2.40) 29 Gypsum (Ex. Knauf 9 mm (1.20×2.40) 30 Gypsum (Ex. Star 9 mm (1.20×2.40) 31 Gypsum (Ex. Aplus 9 mm (1.20×2.40) I. Bata Ringan 32 Bata Ringan 60 x 20 x 7,5 cm (Leicthbric) 33 Bata Ringan 60 x 20 x 7,5 cm (Primacon) 34 Bata Ringan 60 x 20 x 7,5 cm (Power block) J. Spandek 35 Spandek Ex. Abadi 914 (L 770 / 750 /680/700) 0.30mm 36 Spandek Ex. Abadi 914 (L 770 / 750 /680/700) 0.35mm 37 Spandek Ex. Abadi 914 (L 770 / 750 /680/700) 0.40mm 38 Spandek Ex. Abadi 914 (L 770 / 750 /680/700) 0.45mm 39 Spandek Ex. Abadi 914 (L 770 / 750 /680/700) 0.50mm 40 Spandek Import 914 (770 / 750 /680/700) Warna 0.25mm 41 Spandek Import 914 (770 / 750 /680/700) Warna 0.3 mm 42 Spandek Import 914 (770 / 750 /680/700) Warna 0.35 mm 43 Spandek Import 914 (770 / 750 /680/700) Warna 0.4 mm 44 Spandek Import 914 (770 / 750 /680/700) Warna 0.45mm 45 Spandek Import 914 (770 / 750 /680/700) Warna 0.5 mm 46 Spandek + Peredam 0.25 47 Spandek + Peredam 0.3 48 Spandek + Peredam 0.35 49 Spandek + Peredam 0.4 50 Spandek Zincalume 1219 0.30mm * 51 Spandek Zincalume 1219 0.35mm 52 Spandek Zincalume 1219 0.45mm 53 Spandek Zincalume 1219 0.50mm 54 Spandek Zincalume 1219 0.50mm
3
Satuan Harga di Kabupaten / Kota BERAU Zona II Zona III Zona IV
4
5
6
7
Keterangan Zona V 8
M' M' M' M'
40,300.00 40,300.00 33,300.00 88,700.00
52,000.00 52,000.00 42,900.00 114,400.00
53,800.00 53,800.00 44,400.00 118,400.00
61,200.00 61,200.00 50,600.00 134,700.00
62,100.00 62,100.00 51,300.00 136,800.00
Liter Kg Liter
270,200.00 122,200.00 283,100.00
348,400.00 157,600.00 365,000.00
360,500.00 163,000.00 377,700.00
410,400.00 185,600.00 430,000.00
416,600.00 188,400.00 436,400.00
Lbr Lbr Lbr Lbr Lbr
80,700.00 77,800.00 75,000.00 75,000.00 73,600.00
104,000.00 100,300.00 96,700.00 96,700.00 94,900.00
107,700.00 103,800.00 100,100.00 100,100.00 98,200.00
122,600.00 118,200.00 113,900.00 113,900.00 111,800.00
124,400.00 120,000.00 115,600.00 115,600.00 113,500.00
Bh Bh Bh
86,900.00 86,900.00 89,200.00
112,000.00 112,000.00 115,000.00
115,900.00 115,900.00 119,000.00
132,000.00 132,000.00 135,500.00
133,900.00 133,900.00 137,500.00
M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M' M'
57,300.00 63,700.00 70,100.00 76,600.00 83,000.00 17,000.00 18,300.00 19,900.00 862,100.00 92,600.00 99,100.00 77,200.00 20,900.00 92,600.00 100,400.00 63,100.00 75,900.00 83,600.00 96,500.00 100,400.00
73,900.00 82,100.00 90,400.00 98,800.00 107,000.00 21,900.00 23,600.00 25,700.00 1,111,600.00 119,400.00 127,800.00 99,500.00 27,000.00 119,400.00 129,400.00 81,300.00 97,900.00 107,800.00 124,400.00 129,400.00
76,400.00 85,000.00 93,500.00 102,200.00 110,700.00 22,700.00 24,400.00 26,600.00 1,150,200.00 123,600.00 132,200.00 103,000.00 27,900.00 123,600.00 133,900.00 84,200.00 101,300.00 111,500.00 128,700.00 133,900.00
87,000.00 96,700.00 106,500.00 116,300.00 126,100.00 25,800.00 27,800.00 30,200.00 1,309,400.00 140,700.00 150,500.00 117,300.00 31,700.00 140,700.00 152,500.00 95,800.00 115,300.00 127,000.00 146,600.00 152,500.00
88,300.00 98,200.00 108,100.00 118,100.00 128,000.00 26,200.00 28,200.00 30,700.00 1,329,100.00 142,800.00 152,800.00 119,000.00 32,200.00 142,800.00 154,800.00 97,300.00 117,000.00 128,900.00 148,800.00 154,800.00
9
Halaman 25