1
ANY PIPE CONNECTION TO THE TURBINE IS A POTENTIAL SOURCE OF WATER EITHER BY INDUCTION FROM EXTERNAL EQUIPMENT OR BY ACCUMULATION OF CONDENSED STEAM
2
DESIGN BASIS
• ASME TDP – 1 • RECORD NOTES OF DISCUSSION HELD AT TS-HQ, N.DELHI ON 12.09.91 REGARDING DRAINS SYSTEM
• SPECIFIC CUSTOMER REQUIREMENTS
3
DESIGN CRITERIA
• DETECTION OF THE PRESENCE OF WATER • ISOLATION OF THE WATER PREFERABLY AUTOMATIC MEANS
BY
MANUAL
OR
• DISPOSAL OF THE WATER PREFERABLY AUTOMATIC MEANS
BY
MANUAL
OR
• NO SINGLE FAILURE OF EQUIPMENT SHOULD RESULT IN WATER ENTERING THE TURBINE
4
MAIN STEAM PIPING
5
MAIN STEAM PIPING • MS PIPING DRAINS UPTO TURBINE VALVES ARE LED TO ATMOSPHERE
• DRAINS DOWNSTREAM OF TURBINE STOP VALVES ARE LED TO CONDENSER • START-UP DRAIN IS PROVIDED AT THE UPSTREAM OF BOILER STOP VALVE • MS STRAINER IS THE LOWEST POINT AND FORMS THE DRAIN POINT • BEFORE SEAT DRAIN IS CASCADED BACK TO THE MAIN STEAM LINE • DURING START-UP MS STRAINER / LINE DRAINS ARE OPEN TO ATMOSPHERE CONTD. 6
MAIN STEAM PIPING
• AUTOMATIC CLOSURE OF MS STRAINER & LINE DRAINS • SEPARATE ATMOSPHERIC FLASH TANK (UFT) IS PROVIDED IN TG AREA TO RECEIVE MS DRAINS / HP BY DRAINS TO MINIMIZE ROUTING PROBLEM • DRAINAGE SYSTEM AS DESCRIBED HAS BEEN ADOPTED IN VARIOUS 210 MW / 250 MW / 500 MW PROJECTS LIKE DADRI, UNCHAHAR, BAKRESWAR, DAHANU, SURATGARH, KOTHAGUDEM, SIMHADRI ETC.
7
START-UP DRAIN UPSTREAM OF BOILER STOP VALVE
8
MAIN STEAM LINE DRAINS (TYPICAL FOR ONE LEG)
HPT
(BEFORE SEAT DRAIN)
MAIN STEAM
(AFTER SEAT DRAIN)
TO TURBINE FLASH BOX (MAL SYSTEM)
TO UNIT FLASH TANK (L.O.) (MS STRAINER DRAIN)
9
MAIN STEAM STRAINER DRAIN
10
HOT REHEAT PIPING
11
HOT REHEAT PIPING • DRAINAGE SYSTEM IS SIMILAR TO THAT OF MAIN STEAM EXCEPT THAT PRIOR TO STARTING THE TURBINE THE HOT REHEAT PIPING WILL BE AT CONDENSER PRESSURE, HENCE HOT REHEAT PIPING DRAINS ARE TO BE LED TO CONDENSER • HRH DRAIN VALVES ARE OPEN BEFORE START OF VACUUM PULLING • AUTOMATIC CLOSURE OF HRH STRAINER & LINE DRAINS
• ADDITIONALLY MANUAL DRAIN IS PROVIDED AT THE UPSTREAM OF RH ISOLATING DEVICE TO FACILITATE DRAINING OF PIPING AFTER HYDRO TEST OF RH SECTIONS 12
HRH RH ISOLATING DEVICE
13
HRH LINE DRAINS (TYPICAL FOR ONE LEG )
IPT
(BEFORE SEAT DRAIN)
TO TURBINE FLASH BOX (MAL SYSTEM) (AFTER SEAT DRAIN)
HOT REHEAT
(L.O.) (HRH STRAINER DRAIN)
TO CONDENSER FLASH TANK
14
HRH DRAIN BETWEEN IPT & VALVE
15
HRH STRAINER DRAIN
16
COLD REHEAT PIPING
17
COLD REHEAT PIPING • THE POTENTIAL SOURCE OF WATER INGRESS INTO CRH PIPE ARE: REHEATER SPRAY HP BY SPRAY TOP HEATER EXTRACTION PIPING FROM HP EXHAUST • DESIGN OF DRAINAGE SYSTEM TO REMOVE THE ENTIRE WATER THAT CAN ENTER INTO CRH LINE IS IMPRACTICAL • SYSTEM IS DESIGNED TO PROVIDE SIGNAL TO ENABLE OPERATOR TO TAKE CORRECTIVE ACTION TO PREVENT WATER INFLOW
• CRH PIPING DRAINS ARE LED TO CONDENSER AS IT COMES UNDER VACUUM DURING START-UP CONTD. 18
COLD REHEAT PIPING
• PIPING DOWNSTREAM OF CRH NRV FORMS LOWEST POINT IN THE CRH LINE • ADDITIONALLY DRAIN IS PROVIDED BETWEEN HP TURBINE EXHAUST & CRH NRV • A MANUAL DRAIN IS ALSO PROVIDED AT THE DOWNSTREAM OF RH ISOLATING DEVICE TO FACILITATE DRAINING OF PIPING AFTER HYDRO TEST OF RH SECTIONS
19
CRH RH ISOLATING DEVICE
20
COLD REHEAT LINE DRAINS
HPT HH A
DRAIN POT H A
LS LS
(L.O.)
TO TURBINE FLASH BOX (MAL SYSTEM)
(L.O.)
TO CONDENSER FLASH TANK
21
CRH PIPING DRAIN BETWEEN HPT EXHAUST & NRV
22
CRH PIPING DRAINS
23
CRH PIPING DRAIN POT
• DRAIN POT OF 6 INCH DIA IS PROVIDED IN 210 MW / 250 MW & 12 INCH DIA IN 500 MW AT THE EACH LOW POINT • TWO LEVEL SWITCHES ARE INSTALLED ON THE DRAIN POT FOR SENSING OF PRESENCE OF CONDENSATE IN THE DRAIN POT AND EFFICIENT EVACUATION OF THE SAME • LEVEL SWITCH AT HIGH LEVEL SHALL INITIATE FULL OPENING OF THE DRAIN VALVE AS WELL AS PROVIDE AN ALARM IN CONTROL ROOM • LEVEL SWITCH AT HIGH HIGH LEVEL SHALL INITIATE AN ALARM AND REPEAT COMMAND FOR OPENING DRAIN VALVE CONTD. 24
CRH PIPING DRAIN POT
• HIGH HIGH LEVEL IS A WARNING TO THE OPERATOR TO INVESTIGATE & ISOLATE THE SOURCE OF WATER INGRESS • BEFORE START OF VACUUM PULLING CRH DRAINS ARE OPEN TO CONDENSER AND OPERATOR TO ENSURE NO ALARM CONDITION ( CW PUMP & CEP ARE RUNNING) • SPRAY IS ENVISAGED IN FLASH TANK TO COOL DRAINS
• CLOSING OF CRH DRAIN VALVE IS REMOTE MANUAL
25
CRH DRAIN POT ARRANGEMENT
26
HP BY PIPING
27
HP BY PIPING • HP BY WARM-UP & DRAIN ARRANGEMENT HAS BEEN ADOPTED IN LINE WITH DELIBERATIONS DTD. 20-21ST FEB. ‘ 1998 AT TRICHY • HP BY PIPING LAYOUT IS SUCH THAT ENTIRE PIPING IS SELF DRAINABLE TOWARDS MAIN STEAM / COLD REHEAT PIPING • WARM-UP TAPPING IS PROVIDED CLOSE TO THE BY VALVE FROM BOTTOM OF THE PIPING • WARMING-UP LINE IS CONNECTED TO CRH LINE MINIMUM 5M AWAY FROM TEMPERATURE TAPPING POINTS • START-UP DRAIN IS PROVIDED ON THE WARM-UP LINE AND IS LED TO ATMOSPHERE CONTD. 28
HP BY PIPING
• START-UP DRAIN OPENS PRIOR TO STARTING THE UNIT AND CLOSES WHEN HP BY VALVE IS TAKEN INTO SERVICE
• TEMPERATURE MEASUREMENT SHALL BE PROVIDED AT HP BY VALVE INLET • HP BY VALVE TO BE LOCATED ABOVE THE MAIN STEAM & CRH PIPING • WARMING-UP LINE TO DOWNSTREAM OF MS STRAINER IS NOT PREFERRED AT IT WOULD LEAD TO UNSTRAINED STEAM TO TURBINE
29
HP BY WARMING-UP SCHEME
HP BY VALVE TE TE
250 mm
TE
5 M (min)
WARM-UP LINE (LO)
COLD REHEAT LINE
MAIN STEAM LINE START-UP DRAIN TO UFT
30
HP BY WARM-UP PIPING
31
LP BY PIPING
32
LP BY WARM-UP PIPING
33
LP BY WARM UP PIPING
34
LP BY PIPING • IN EARLIER 210MW SETS AN ISOLATING ENVISAGED IN LP BY WARM-UP SCHEME
VALVE
WAS
• THE PURPOSE OF ISOLATING VALVE IS TO ISOLATE WARM-UP LINE DURING INITIAL COLD START-UP • THIS VALVE HAS TO BE KEPT OPEN IN ALL OTHER MODES OF OPERATION • BASED ON THE SITE AN ANALYSIS WAS DONE & IT WAS OBSERVED THAT OPERATION OF ISOLATING VALVE WAS NOT PROPER AND WAS USUALLY LEFT CLOSED WHICH LEAD TO PROBLEMS WITH LP BY SYSTEM
• FROM DADRI 210MW TPS ONWARDS THIS ISOLATING VALVE HAS BEEN DISPENSED WITH CONTD. 35
LP BY PIPING
• IN 500MW PROJECTS ALSO THERE IS NO ISOLATING VALVE IN THE WARM-UP LINE • THIS HAS ENHANCED THE SYSTEM RELIABILITY AND EASE IN OPERATION
• LP BY LOOP PIPING DRAINS CAN BE CASCADED BACK TO HRH PIPING (BETWEEN TURBINE & STRAINER) AT AN LOWER ELEVATION OTHERWISE DRAIN CAN BE LED TO CONDENSER • DRAIN ON WARMUP LINE IS PROVIDED CLOSE TO VALVE TO ENSURE WARMING UP CONTD. 36
LP BY PIPING
• BEFORE PULLING VACUUM IN THE CONDENSER OPEN ABOVE DRAINS TO CONDENSER • ONCE LP BY VALVE IS TAKEN INTO OPERATION THESE DRAIN VALVES CAN BE CLOSED
37
LP BY WARMING UP SCHEME FOR 210 MW UNITS
HRH LINE
HRH STRAINER
CONTROL VALVE TO CONDENSER
Nb 450
STOP VALVE
LP BY MAIN LINE TO TURBINE Nb 50
LP BY
TO CONDENSER VIA FLASH TANK
WARM-UP LINE WARM-UP STEAM FLOW IN COLD CONDITION WARM-UP STEAM FLOW DURING NORMAL RUNNING OF TURBINE
38
LP BY WARMING UP SCHEME FOR 500 MW UNITS HRH LINE
HRH STRAINER
Nb 650
STOP VALVE
LP BY MAIN LINE TO CONDENSER
TO TURBINE
TO CONDENSER VIA FLASH TANK
CONTROL VALVE Nb 50
LP BY WARM-UP LINE
WARM-UP STEAM FLOW IN COLD CONDITION WARM-UP STEAM FLOW DURING NORMAL RUNNING OF TURBINE
39
OPERATING MODES
• COLD START-UP DRAINS SHALL BE OPERATED AS DESCRIBED EARLIER • HOT START-UP DURING TURBINE TRIPPED / BOILER TRIPPED CONDITION, OPEN AND CLOSE DRAINS AS IN COLD START-UP. MS STRAINER DRAINS ARE TO BE CLOSED AS SOON AS 50°COF SUPERHEAT IS ACHIEVED AND BY IS ESTABLISHED. DURING TURBINE TRIPPED / BOILER IN SERVICE WITH HP/LP BY CONDITION NO DRAINS TO BE OPENED 40
NTPC SPECIFIC REQUIREMENTS
FOLLOWING ARE ADDITIONAL FEATURES PROVIDED IN NTPC PROJECTS AS PER THE CONTRACTUAL REQUIREMENT: • ANGLE VALVES INSTEAD OF GLOBE VALVES IN DRAIN LINES • NTPC SPECN. CALLS FOR TWO DRAINS FOR EACH DRAIN POINT I.E. ONE AS NORMAL DRAIN TO DRAIN FLASH TANK AND THE OTHER AS ALTERNATE DRAIN TO ATMOSPHERIC FLASH TANK. AFTER DELIBERATIONS ALTERNATE PATH ARE PROVIDED FOR MAIN STEAM DRAINS & HOT REHEAT DRAINS ONLY • CLEAN OUT VALVES FOR DRIP POTS
41
ANGLE VALVE DRAIN ARRANGEMENT
42
FLASH TANKS SPRAY SYSTEM
FOR COOLING OF INCOMING HOT DRAINS FOLLOWING SPRAYS ARE ENVISAGED IN THE FLASH TANKS: • CONDENSATE SPRAY FROM CEP DISCHARGE TO CONDENSER FLASH TANK THROUGH TEMPERATURE REGULATED ON / OFF TYPE CONTROL VALVE • CONTINUOUS SPRAY THROUGH A MANUAL REGULATING VALVE & RESTRICTION ORIFICE FROM SERVICE WATER SYSTEM TO UNIT FLASH TANK • CONTINUOUS SPRAY THROUGH A RESTRICTION ORIFICE FROM CEP DISCHARGE VALVE GLAND SEALING HEADER TO HP DRAIN FLASH TANK 43
UNIT FLASH TANK ARRANGEMENT (TYP)
HPBP WARM-UP MS STRAINER LINE DRAINS (TYP) DRAINS (TYP)
( LO )
( LO ) SPRAY WATER FROM SERVICE WATER SYSTEM
UNIT FLASH TANK
3M
TO DRAIN TRENCH
44
GENERAL RECOMMENDATIONS • DESIGN , CONTROL AND OPERATION OF ALL SYSTEM THAT HAVE A POTENTIAL FOR ALLOWING WATER TO THE TURBINE SHALL PREVENT ANY UNUSUAL ACCUMULATION • DRAINS SHALL BE INSTALLED AT EVERY LOW POINT WITH ADEQUATE MEANS (MANUAL / AUTOMATIC) TO DISPOSE OFF THE CONDENSATE COLLECTED • DRAIN LINE SIZE SHALL BE SUFFICIENT TO PREVENT RISK OF PLUGGING BY FOREIGN MATERIAL. NORMALLY DRAIN LINE SIZE IS 2 INCH
• ALL DRAIN LINES SHALL PREFERABLY BE RUN INDIVIDUALLY AND HAVE CONTINUOUS SLOPE TOWARDS THE DISPOSAL POINT CONTD. 45
GENERAL RECOMMENDATIONS
• HIGH PRESSURE DRAINS SHALL BE PROVIDED WITH TWO VALVES IN SERIES , UPSTREAM LOCKED OPEN VALVE & DOWNSTREAM MOTORIZED VALVE. LOW PRESSURE DRAINS SHALL BE PROVIDED WITH MOTORIZED VALVE • ALL MOTORIZED DRAINS SHALL HAVE FACILITY TO OPERATE FROM UNIT CONTROL ROOM WITH OPEN / CLOSE POSITION INDICATION • OPERATOR TO ENSURE THAT ALL THE MOTORISED DRAIN VALVES SHALL BE CLOSED IMMEDIATELY ON ATTAINMENT OF 10% BLOCK LOAD ON TURBINE • INSTALLATION LEVELS OF MS STRAINER. HRH STRAINER , CRH NRV ETC SHALL BE SUCH THAT DRAIN CAN BE LED WITH CONTINUOUS PROPER SLOPE TO THE TERMINAL POINT CONTD.
46
GENERAL RECOMMENDATIONS
• ALTERNATE PATH SHOULD BE AVOIDED AS IT BECOMES SOURCE OF AIR INGRESS. ALSO AT SOME SITES ITS MALOPERATION RESULTED SUCKING OF WATER FROM ATMOSPHERIC TANK INTO THE MAIN PIPING LEADING TO SEVERE PROBLEMS • DRAINS TO MANIFOLD SHALL BE GROUPED IN APPROXIMATELY SAME PRESSURE RANGES OTHERWISE DRAINS SHALL BE ARRANGED IN A DECREASING ORDER OF THE PRESSURE • DRAIN LINES TO THE MANIFOLD SHALL BE MOUNTED AT 450 TO THE MANIFOLD AXIAL CENTRE LINE WITH THE DRAIN LINE DISCHARGE POINTING TOWARDS THE DISPOSAL POINT CONTD. 47
GENERAL RECOMMENDATIONS
• DRAIN SHALL BE PREFERABLY TAPPED THROUGH A DRIP POT
• LOOPS REQUIRED FOR FLEXIBILITY SHALL BE IN THE PLANE OF THE SLOPE • LOOP DRAINS CAN BE CASCADED BACK TO THE MAIN PIPING BY GRAVITY AT A LOWER ELEVATION • OPERATION OF DRAIN VALVE, PLUGGING OF DRAIN LINES AND HEALTHINESS OF INSTRUMENTS SHALL BE PERIODICALLY CHECKED • LEVEL ACTUATED MECHANISM SHALL BE TESTED AT INTERVALS TO ENSURE THEIR PROPER FUNCTIONING • DRIP POTS, TRAPS & ORIFICES FOR ALL DRAIN LINES SHALL BE REGULARLY CLEANED 48
49